REVISED DATE: 5/5/2016
KENNEL CLUB PLAYGROUND INSTALLATION GUIDELINE
Page 1
Kennel Club Playground
Installation Guideline
This space intentionally left blank.
Recommended Crew:
Minimum 1-2 People
Tools Required for Assembly:
T-30 TORX Bit
3/16” x 6” Drill Bit
Post Hole Digger / Shovel / Auger
Tape Measure
Level
High Speed 3/8” electric drill w/ clutch
Installation Time:
6 to 8 hours
Concrete Required:
1.8 cu ft. per post
Note: Concrete must have a minimum rating of 2,500 psi and must be mixed per
manufacturers recommendation.
20020 Hickory Twig Way
●
Spring
,
Texas 77388
Phone:
281
-
288
-
6693
●
Fax:
281
-
288
-
2870