background image

581-638 8’ Modern Bipod 6 Seat Swing

 

GENERAL FOOTING RECOMMENDATIONS 
 

Diameter and depth of footings illustrated are satisfactory in most 
applications for pipe sizes up to 2 3/8” diameter.  Varying soil & climatic 
conditions may require deeper and heavier footings in some areas.  Check 
local building codes. 
 
Diagram: 

       

 

 

 

Diagram: 

Permanent Installation   

 

 

 

    Suggested Bracing Method 

 
 
 
 

 
 
 
 
 
 
 
 
 
 

IF RESILIENT SURFACING IS TO BE LESS THAN 12”, THEN ADDITIONAL PIPE SHOULD BE 
PUT IN CONCRETE TO MAINTAIN PROPER FINISH GRADE FOR EQUIPMENT. 

 

USE AREA AND FOOTING LAYOUT:   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

Содержание 581-638

Страница 1: ...ssibly create dangerous situations leading to unnecessary accidents Resilient Surfacing should be used under all playground equipment Appropriate publications available at no charge from the Consumer Product Safety Commission include A Handbook for Public Playground Safety You can receive your free copy by calling 1 301 504 7908 PACKING LIST HARDWARE BAG 1 CTN Hardware Bag 12 585 520 2 3 8 Swing H...

Страница 2: ... up to 2 3 8 diameter Varying soil climatic conditions may require deeper and heavier footings in some areas Check local building codes Diagram Diagram Permanent Installation Suggested Bracing Method IF RESILIENT SURFACING IS TO BE LESS THAN 12 THEN ADDITIONAL PIPE SHOULD BE PUT IN CONCRETE TO MAINTAIN PROPER FINISH GRADE FOR EQUIPMENT USE AREA AND FOOTING LAYOUT ...

Страница 3: ... Check MONTHLY for loose bolts damaged or broken parts Tighten and or replace immediately On swings and any equipment that uses S hooks and or Swing Hangers check the bearing surfaces for wear Replace any parts that show a reduction of 25 from the original size ASSEMBLY AND INSTALLATION NOTE All threaded ends of bolts protruding beyond nuts must be cut off and or peened to eliminate sharp edges No...

Страница 4: ...er intended level of resilient surfacing and top rail is at desired height STEP 6 Plumb and level entire unit Tighten set screws by using short length of pipe on end of socket key to add leverage Pour concrete Crown surface Wait 48 hours before removing braces and using equipment STEP 7 Attach assembled seats to swing hangers by reattaching the pendulums to the swing hangers Do not over tighten bo...

Отзывы: