background image

   

5

ATTACH FOOTER POSTS TO CRAWL TUNNEL AND FOOTERS

Parts List

Letter Description

Quantity Part Number

A

Crawl Tunnel

1

02-07-0057
02-07-0087
02-07-0043
33-12-0058
33-11-0103
33-11-0501
33-11-0005
33-11-0400

B
C

Support Post
Footer 

2
4

Hardware Complete

1

D

10

E

10

F

M8 x 25 BHCS Bolt

M10 x 35 BHCS Bolt  

M8 Barrel Nut

G

4

M10 Lock Nut

4

B

C

D

E

A

F

G

Figure 1

1. Lower U-shaped Support Post(B) behind 
    flange of Crawl Tunnel(A).

2. Insert Bolt(D) through center hole in 
    Crawl Tunnel(A), into Support Post(B) and 
    secure with Barrel Nut(E).

    NOTE: Lightly tighten Bolts(D) until all
                Bolts(D) have been inserted.

3. Repeat Step 2 for remaining Bolts(D).
    

4. Align hole in Support Post(B)
    with hole in Footer(C).

    NOTE: Use UPPER hole if
               using EWF
               (Engineered Wood Fiber)

               Use LOWER hole if using
               2” rubber tiles or poured-
               in-place surfacing.

 
5.  Insert Bolt(F) through larger
     hole in Support Post(B), into
     Footer(C) and through the
     other side of Support Post(B)
     and secure with Lock Nut(G).

     See Figure 1.

6. Repeat steps 4-5 for Remaining
    Footers(C).

Use this hole for
EWF

Use this hole for
Rubber Tiles or 
Poured-in-place
surfacing

Содержание 02-07-0057

Страница 1: ...MODEL 02 07 0057 ASSEMBLY INSTRUCTIONS 04 11 11 20020 Hickory Twig Way Spring TX 77388 Toll Free 1 877 857 2915 www terraboundsolutions com ...

Страница 2: ...cushion accidental falls GROUND Support Post 3 Ground Spikes Support Post 4lb Hammer Footer Footer SURFACING Footing Detail for Installations Placed on Ground Level Instructions 1 With Footers in position secure each footer to the ground using 3 ground spikes NOTE A 4 lb hammer may be required to drive spikes into the ground Install ground spikes angled inward as shown in illustration Clear area o...

Страница 3: ...nground Footer together using 3 M10 x 20mm 3 4 BHCS Bolts and M10 Lock Nuts 3 M10 x20mm 3 4 BHCS Bolts 3 M10 Lock Nuts IMPORTANT Never install play equipment over hard unresilient surfaces such as asphalt concrete or compacted earth It is the owner s responsibility to ensure the minimum area required contains an appropriate amount of resilient material to cushion accidental falls GROUND Support Po...

Страница 4: ...rough center hole in Crawl Tunnel A into Support Post B and secure with Barrel Nut E NOTE Lightly tighten Bolts D until all Bolts D have been inserted 3 Repeat Step 2 for remaining Bolts D 4 Align hole in Support Post B with hole in Footer C NOTE Use UPPER hole if using EWF Engineered Wood Fiber Use LOWER hole if using 2 rubber tiles or poured in place surfacing 5 Insert Bolt F through larger hole...

Страница 5: ... 12 0058 33 11 0002 33 11 0400 B C 4 Hardware Complete 1 D M10 x 20 BHCS Bolt 12 12 M10 Lock Nut ABOVE GROUND INSTALLATION For Above Ground installation using Ground Spikes A refer to Mounting Option 1 on page 2 IN GROUND INSTALLATION For In Ground installation using the In ground Footer B refer to Mounting Option 2 on pages 3 and 4 B C A D or ...

Отзывы: