5
ATTACH FOOTER POSTS TO CRAWL TUNNEL AND FOOTERS
Parts List
Letter Description
Quantity Part Number
A
Crawl Tunnel
1
02-07-0057
02-07-0087
02-07-0043
33-12-0058
33-11-0103
33-11-0501
33-11-0005
33-11-0400
B
C
Support Post
Footer
2
4
Hardware Complete
1
D
10
E
10
F
M8 x 25 BHCS Bolt
M10 x 35 BHCS Bolt
M8 Barrel Nut
G
4
M10 Lock Nut
4
B
C
D
E
A
F
G
Figure 1
1. Lower U-shaped Support Post(B) behind
flange of Crawl Tunnel(A).
2. Insert Bolt(D) through center hole in
Crawl Tunnel(A), into Support Post(B) and
secure with Barrel Nut(E).
NOTE: Lightly tighten Bolts(D) until all
Bolts(D) have been inserted.
3. Repeat Step 2 for remaining Bolts(D).
4. Align hole in Support Post(B)
with hole in Footer(C).
NOTE: Use UPPER hole if
using EWF
(Engineered Wood Fiber)
Use LOWER hole if using
2” rubber tiles or poured-
in-place surfacing.
5. Insert Bolt(F) through larger
hole in Support Post(B), into
Footer(C) and through the
other side of Support Post(B)
and secure with Lock Nut(G).
See Figure 1.
6. Repeat steps 4-5 for Remaining
Footers(C).
Use this hole for
EWF
Use this hole for
Rubber Tiles or
Poured-in-place
surfacing