background image

Nominal power* TKK3 max (KW)

100

120

150

200

250

300

Max power coal* (KW)

100

120

150

200

250

300

Max power wood* (KW)

87

103,5

129

169,5

210

262,5

Power range coal* (KW)

80-110

100-
130

130-
180

180-
240

220-
290

270-
350

Necessary draught (mbar)

0.29

0.3

0.35

0.41

0.45

0.5

Water content (l)

170

230

290

320

350

430

Output gas temperature at nominal power (

C)

250

250

250

250

250

250

Temp. regulation range (solid fuel) (

C)

60-90

60-90

60-90

60-90

60-90

60-90

Minimum temp. return line (solid fuel) (

C)

60

60

60

60

60

60

Efficiency

76,7%

81,8%

81,6%

81,8%

81,9%

79,2%

Boiler class

3

3

3

3

3

3

Required chimney height** (m)

9-10

10-11

11-12

11-12

12-13

15-17

Required chimney inner diameter** (mm)

250

250

300

350

350

350

* Values given for coal with caloric value 18000 KJ/kg and in the field below for firewood with caloric

value of 15000 KJ/kg. ** Please consult chimney producer manual for detailed information on chimney.

1.3

Maximum Wood Log Size

When using firewood, please note that this is the maximum log length you can put into the boiler.

Boiler type TKK3 max (KW)

Max wood log length (mm)

Heating chamber depth (mm)

100

800

812

120

900

912

150

900

912

200

1000

1015

250

1200

1215

300

1200

1215

1.4

On Product

This boiler is aimed for manual feed of solid fuel (brown coal, firewood, brickets or biomass with
declared caloric value greater than 15000 KJ/kg).

Boiler is constructed by welding steel plates (4-6 mm thickness). Manufacturing process was per-
formed by strict following the guidelines of the corresponding European norms EN 303/5 and ISO
9001. Only certified materials are built in as required by EN 10025, EN 10028-2, EN 10120 and EN
10088-2.

Efficiency of the boiler is higher than 77% thanks to its three pass construction.

Upper and lower door are covered by refractory insulation material based on VERMICULITE
mineral - large amount of heat is kept in the boiler as a consequence.

Boiler has capacious upper door to facilitate manual feeding of the solid fuel.

Combustion control is done by draught regulator (to be ordered separately and mounted on boiler
before use).

Maximum working pressure is 4 bar. Water control test is done on 6 bar.

Boiler is delivered with cleaning kit.

3

Содержание TKK3 max 100

Страница 1: ...l hot water boiler TKK3 max 100 300 KW INSTRUCTIONS MANUAL for usage and maintenance Prhovacka bb 22310 Simanovci Srbija Tel Fax 381 22 480404 381 63 259422 office termomont rs www termomont rs September 9 2013 ...

Страница 2: ...rm 4 2 2 What s in the box 4 3 Boiler installation 4 3 1 Boiler placement 4 3 2 Chimney 4 4 Boiler installation 5 4 1 Fitting the boiler to a closed central heating system 5 4 1 1 Installation method 1 5 4 1 2 Installation method 2 7 4 2 Fitting the boiler to an open central heating system 7 4 3 Filling up the boiler and installation with water 8 5 Boiler operation 8 6 Boiler cleaning and maintena...

Страница 3: ...ng 11 Base 12 Insulation 13 Boiler housing 14 Draught regulator mounting place 15 Air vent connection 16 Drain tap 1 1 Dimensions Boiler type Weight kg B mm H mm L mm A mm E mm F Φ 100 630 935 1500 1540 1330 220 2 120 760 935 1600 1665 1430 220 2 150 805 1035 1670 1675 1500 220 No65 200 1030 1205 1720 1785 1535 220 No80 250 1500 1355 1800 2075 1570 330 No80 300 1700 1600 1800 2075 1570 330 No80 1 ...

Страница 4: ...ength you can put into the boiler Boiler type TKK3 max KW Max wood log length mm Heating chamber depth mm 100 800 812 120 900 912 150 900 912 200 1000 1015 250 1200 1215 300 1200 1215 1 4 On Product This boiler is aimed for manual feed of solid fuel brown coal firewood brickets or biomass with declared caloric value greater than 15000 KJ kg Boiler is constructed by welding steel plates 4 6 mm thic...

Страница 5: ...idity in the storing room also must not exceed the critical value of 80 so as not to create any condensate The temperature of the storing room must be in the range of 40 C 2 2 What s in the box The following parts are supplied together with the boiler Cleaning kit Warranty note 3 Boiler installation 3 1 Boiler placement The boiler room should have air conditioning Equation for the are aof opening ...

Страница 6: ...producer Minimum chimney height for TKK3 max 120 wood boiler is 9 m Estimate for chimney height is given in the technical data chart Round chimney made of stainless steel modules is recommended in order to keep the condensation influence low 4 Boiler installation 4 1 Fitting the boiler to a closed central heating system Depending on the position of the boiler in relation to the pipe work and the r...

Страница 7: ...perture at the seat of the valve must be at least 15mm Connecting pipe work to the boiler must be as short as possible Welds joints or any possible blockage to this pipe work must be prevented Bends in the pipe work should be avoided if possible Unavoidable bends should be at diameter r 3D D radius of curvature and less than α 90 C Closed expansion vessel The closed expansion vessel shall be fitte...

Страница 8: ...n 4 2 Fitting the boiler to an open central heating system The connecting scheme of an open central heating system is depicted on the figure Open expansion vessel is connected to the hot water distribution pipes FLOW and RETURN as shown on Figure with an additional OVERFLOW pipe output plus CIRCULATION pipe to prevent freeze during winter months Please note that no additional items shall be connec...

Страница 9: ...plete liability for the material damage and potential new costs arising in relation to it is borne exclusively by the person who was entrusted with the mounting of the central heating system and not by the boiler manufacturer sales representative or seller 5 Boiler operation First putting into operation is performed exclusively by a skilled person Before putting in operation please make sure that ...

Страница 10: ...hardness may not exceed the recommended value If you heat the boiler using coal de pending on the kind of coal and quality of combustion boiler is to be cleaned in detail at least every 30 days Dirtier the boiler the efficiency of the system is smaller It is not allowed to extinguish the fire in the boiler artificially it is forbidden to sprinkle the water inside the heating chamber After the heat...

Отзывы: