Newage Generators Maintenance Schedule
ITEM
DAILY
250 Hours
or 3
Months
1500 Hours
or 12
Months
4500 Hours
or 3 Years
15000
Hours or 19
Years
Visual inspection
•
Visual inspection plus running audible check
•
Measure stator winding insulation resistance
and record
•
Monitor bearing/s condition
•
Remove terminal box lid and check
connections
•
Re-grease bearings
•
Measure vibration levels
•
Replace bearing/s
•
Replace NDE o-ring
•
Inspect bearing housings
•
Inspect winding conditions
•
Inspect rotating diode assembly
•