7.3 Maintenance Intervals
7.3-1 Daily Maintenance Tasks
7.3-2 50-1000 hour Tasks
7 MAINTENANCE
66
Page
1
Check hydraulic oil level (figure 7.7-3, p-70)
70
2
Check engine oil level
68
3
Check fuel level (gauge on instrument panel)
41
4
Check fan belt tension / condition
71
5
Check track tension / condition
73
6
Check for proper control operation
42
7
Check for proper switch and lighting operation
41
8
Check / clean air cleaner elements
46
9
General visual check for cracks, damage, completeness
24,49
10
Check for leaks in hoses, tubes, valves, pumps, cylinders, etc.
22,31,49
11
Drain water separator
72
12
Lubricate all grease points
67
13
Inspect / clean the radiator/cooler and engine compartment
78-79
Daily
Page
1
Inspect drive sprocket rollers (replace as needed)
75
Page
1
Replace engine oil & filter
69
2
Replace hydraulic filter(s)
71
Page
1
Replace fuel filter element
72
Page
1
Replace hydraulic oil
70
2
Replace engine coolant (use SCA additive, see engine manual)
78
Every 50 operating hours
Every 250 operating hours
Every 500 operating hours
Every 1000 operating hours
PT-50/60 US/ROW PT-50T AUS O&M
2030-778 2013-12
Содержание PT50T
Страница 5: ...4 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Страница 7: ...6 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Страница 33: ...32 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Страница 35: ...34 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Страница 41: ...40 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Страница 49: ...48 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Страница 59: ...58 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Страница 63: ...62 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Страница 65: ...64 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Страница 85: ...SERVICE LOG 84 Hours Service Performed Notes PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Страница 86: ...Hours Service Performed Notes SERVICE LOG 85 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Страница 87: ......