
Operator's Manual
Second Edition • Third Printing
Operating Instructions
44
GS™-2669RT • GS™-3369RT • GS™-4069RT
Part No. 1298222GT
Lay the piece of wood on the slope.
At the downhill end, lay the level on the top edge
of the piece of wood and lift the end until the piece
of wood is level.
While holding the piece of wood level, measure
the vertical distance from the bottom of the piece
of wood to the ground.
Divide the tape measure distance (rise) by the
length of the piece of wood (run) and multiply by
100.
Example:
Piece of wood = 144 inches (3.6 m)
Run = 144 inches (3.6 m)
Rise = 12 inches (0.3 m)
12 in ÷ 144 in = 0.083 x 100 = 8.3% grade
0.3 m ÷ 3.6 m = 0.083 x 100 = 8.3% grade
If the slope exceeds the maximum slope or side
slope rating, then the machine must be winched or
transported up or down the slope. See Transport
and Lifting section.
To Extend and Retract Platform
1 Lift the platform extension lock handles to the
horizontal position.
2 Push the platform extension lock handles to
extend the platform to the desired position.
Do not stand on the platform extension while trying
to extend it.
3 Lower the platform extension lock handles and
make sure the extension deck is locked.
Platform Overload
If the platform controls LED diagnostic readout
displays a flashing OL and the ground controls
LCD diagnostic readout displays OL: Platform
Overloaded, the platform is overloaded and no
functions will operate. An alarm will sound.
1 Push in the Red Emergency stop button to the
off position.
2 Remove weight from the platform.
3 Pull out the Red Emergency Stop button to the
on position.
LED Readout
LCD Readout
Содержание GS69F-18000
Страница 59: ......