Operator's Manual
Second Edition • Third Printing
Inspections
34 ZX-135/70
Part No. 1258936
Test the Operating Envelope
27
Press the LCD screen
control buttons shown until
PRI BOOM ANGLE TO
GRAVITY is displayed.
28
Raise the primary boom and observe the LCD
screen.
Result: The primary boom should raise and the
LCD screen should display the primary boom
angle in degrees.
29
Lower the primary boom.
30
Simultaneously press the 2
LCD screen control buttons
shown to activate status
mode.
31
Press the LCD screen
control buttons shown until
SEC BOOM ANGLE is
displayed.
32
Press and hold the secondary boom up/extend
button.
Result: The secondary boom should raise and
the LCD screen should display the secondary
boom angle in degrees.
The secondary boom should raise and then
extend. The secondary boom should not
extend until it is fully raised.
33
Press and hold the secondary boom
down/retract button.
Result: The secondary boom should fully
retract and then lower. The secondary boom
should not lower unless it is fully retracted.
Содержание Genie ZX-135/70
Страница 9: ...Second Edition Third Printing Operator s Manual General Safety Part No 1258936 ZX 135 70 7...
Страница 10: ...Operator s Manual Second Edition Third Printing General Safety 8 ZX 135 70 Part No 1258936...
Страница 47: ...Second Edition Third Printing Operator s Manual Inspections Part No 1258936 ZX 135 70 45...
Страница 66: ...Distributed By www genielift com...