Operator's Manual
Fifth Edition • Second Printing
54
S-100 • S-105 • S-120 • S-125
Part No. T113597
Free-wheel Configuration for
Winching
Chock the wheels to prevent the machine from
rolling.
Release the wheel
brakes by turning
over all four torque
hub disconnect
caps.
Be sure the winch line is properly secured to the
drive chassis tie points and the path is clear of all
obstructions.
Reverse the procedures described to re-engage the
brakes.
Transport Instructions
Observe and Obey:
Genie Industries provides this securement
information as a recommendation. Drivers are
solely responsible for making sure machines are
properly secured and the correct trailer is
selected pursuant to US Department of
Transportation regulations, other localized
regulations, and their company policy.
Genie customers needing to containerize any lift
or Genie product should source a qualified
freight forwarder with expertise in preparing,
loading and securing construction and lifting
equipment for international shipment.
Only qualified aerial lift operators should move
the machine on or off the truck.
Transport vehicle must be parked on a level
surface.
Transport vehicle must be secured to prevent
rolling while machine is being loaded.
Be sure vehicle capacity, loading surfaces and
chains or straps are sufficient to withstand the
machine weight. Genie lifts are very heavy
relative to their size. See the serial label for the
machine weight. See the Decals section for the
serial label location.
Disengage
Engage
Be sure the turntable is secured with the
turntable rotation lock before transporting. Be
sure to unlock the turntable for operation.
Do not drive the machine on a slope that
exceeds the slope or side slope rating. See
Driving on a Slope in the Operating Instructions
section.
If the slope of the transport vehicle bed exceeds
the uphill or downhill maximum slope rating, the
machine must be loaded and unloaded using a
winch as described.
Transport and Lifting Instructions