3-5

3.5.2 

In the case of floor-installed type 

This section describes the procedure for installation by embedding anchor bolts (box-out 
method).
(Select and carry out only the required steps for the pre-embedded anchor bolt method.)

(1)  Clean the surface of the foundation concrete and check the level. 

If necessary, chip the concrete surface

(2)  Clean the anchor bolt hole and remove dust. 

The inner walls of the anchor bolt holes must be 
moist but water should not remain in them. Drain 
any water completely.

(3)  Set one (1) parallel liner and two (2) taper liners 

symmetrically on both sides of the anchor bolt 
hole of the fan as shown in the figure. 
Insert an auxiliary liner (3 mm thickness or more) 
if required. 
If the distance between the anchor bolts exceeds 
1 m, place an additional liner between them.

(4)  Place the fan on the liners, and insert the anchor 

bolts through the bolt holes of the fan so that they are hung inside the box out holes. 
In order to ensure earth-quake resistance, weld the anchor bolts to the reinforcement bars of 
the foundation concrete.

(5)  Adjust and fix the position and height of the fan using taper liners. 

The level should be 0.1 mm per 1 m as a standard.

(6)  Chip the inner walls of the anchor bolt holes to roughen them sufficiently to pour 

non-shrinkage grout into the holes.   
Make sure that the anchor bolts are positioned vertically at the center of the hole.

(7)  After the grout is hardened enough, fasten the nuts of the anchor bolts tightly. 

Be careful not to tighten the nuts unevenly. 
Weld the liners so that they would not be displaced when the fan is running

(8)  Pour sufficient grout between the fan and the foundation concrete so that they form a solid 

concrete structure

(9)  Be careful so that the grout should not be shrunk or cracked. 

Foot of the fan

Auxiliary liner

Taper liner

Parallel liner

Foundation concrete 

Grout cosmetic 

coating

30

50mm

Содержание AESIV

Страница 1: ...intenance of the fan until you read this manual and understand the content Keep this manual carefully at hand so that it can be consulted anytime when operating inspecting or maintaining the fan For c...

Страница 2: ...failures and breakage the costs of the repairs shall be for the account of the user 1 Failures and breakage attributable to equipment that was not delivered by TERAL 2 Failures and breakage after the...

Страница 3: ...labels 1 2 2 Configuration and overview of the fan 2 1 Structure and part names of the fan 2 1 2 2 Specifications and accessories of the fan 2 1 3 Placement and installation 3 1 Before using the fan 3...

Страница 4: ...gineers are allowed to carry out the electrical wiring work Before working be sure to turn off the main power 4 Do not expose the motor to water If it gets wet the resulting short circuit and or insul...

Страница 5: ...be affixed If these labels become dirty and hard to read or if they are peeled off replace with a new one Warning Follow all warnings on the labels affixed to the unit and those in the instruction man...

Страница 6: ...isolator Equipped on only vibration insulation model Rubber vibration isolator Equipped on only vibration insulation model Air Smoke ventilation in case of fire Installation location Indoor ambient te...

Страница 7: ...eck the information on the rated current 50Hz or 60Hz 2 No part of the product is damaged during transportation 3 All fastening parts including bolts and nuts are securely tightened 4 All the accessor...

Страница 8: ...tions are satisfied 3 3 1 Location of installation 1 The unit should be installed at a place higher than the highest vent port of the smoke ventilation line and the extension length of the air duct on...

Страница 9: ...n an outer wall be careful to prevent rain water from entering it and to not allow it to fall while exhausting smoke 6 Install the smoke vent in a way that the discharging speed over an effective open...

Страница 10: ...r embedding anchor bolts When anchor bolts are pre embedded before the fan arrives the bolts should be carefully positioned using a template or other tools 6 When installing two or more foundations is...

Страница 11: ...the anchor bolts through the bolt holes of the fan so that they are hung inside the box out holes In order to ensure earth quake resistance weld the anchor bolts to the reinforcement bars of the found...

Страница 12: ...pplied on the smoke ventilation fan 3 Smoke exhaust duct should be made of noncombustible material and is usually not heat insulated as a rule 4 Connect the duct of discharge side to the smoke vent 5...

Страница 13: ...bited by law to perform incomplete wiring work which exposes personnel to a great danger 2 Connect cables of the fan in reversed phase Standard connections are direct start for 7 5kW or smaller motors...

Страница 14: ...r of poles Output kW 50Hz 60Hz 2 poles 3 7 14 2 13 8 3 7 14 6 14 2 5 5 22 21 7 5 29 28 11 42 5 41 15 56 54 18 5 68 66 22 81 78 30 110 106 37 131 130 4 poles 45 162 156 5 5 24 6 23 11 46 43 15 58 18 5...

Страница 15: ...of the fan Otherwise it may lead to an electric shock 2 Turn on the power and watch the unit closely until it reaches full speed At that time carefully check for unusual noise vibrations current or an...

Страница 16: ...and maintenance of the fan Items of inspection and maintenance to be carried out are shown in the table below Inspection Maintenance Item Inspection Frequency Inspection Maintenance Method Periodical...

Страница 17: ...cident Symptom of failure Cause of failure Insufficient airflow Motor does not run Excessive noise Excessive vibration Motor overload Corrective action Weak foundation 3 3 Reinforce foundation Defecti...

Страница 18: ...Head Office 230 Moriwake Miyuki cho Fukuyama city Hiroshima 720 0003 Japan Tel 81 84 955 1111 Fax 81 84 955 5777 www teral net 2016 06 E IMN 00376 000 T...

Отзывы: