Tennsco ESP-1236 Скачать руководство пользователя страница 2

ASSEMBLY OF OPEN ESP SHELVING

Two people are recommended for assembly. Approximate assembly time: 10-15 minutes.

2.

 

Lay the two corner posts (Ref. No. 1) parallel on the floor or  

 

on saw horses with the short sides facing up.

1.

 

The reference numbers used throughout this sheet refer 

 

to the illustration on the back cover. This is to help you 

 

to identify the various parts as they are mentioned.

3.

 

Create an upright assembly by bolting a side sway plate (Ref.  

 

No. 3) 10 holes down from the top of both corner posts,    

 

connecting them together. Then bolt another side sway plate  

 

ten holes up from the bottom on both corner posts.

 

5.

 

Lean one upright assembly against a wall  

 

or another stable surface and place a  

 

shelf (Ref. No. 2) on the bottom clips  

 

of the post.

4.

 

Place the upright assembly to the side and repeat the first two  

 

steps on the remaining corner posts, creating a second upright  

 

assembly. Place shelf clips (Ref. No. 7) in the top and bottom  

 

holes of all four posts.

Bolt in the tenth hole 

from the bottom.

Shelf Clip

Shelf Clip







Отзывы: