Tennsco Capstone Shelving Units Скачать руководство пользователя страница 2

ASSEMBLY OF A CAPSTONE SHELVING UNIT

Two people are recommended for assembly. Approximate assembly time: 20-30 minutes.

2.

 

Place one shelf support (Ref. No. 5) in the top keyhole slots  

 

of the uprights (Ref. No. 1). Place a bottom shelf support at  

 

the back section, in the bottom keyhole slots on the uprights  

 

as well for stability. Position the front base (Ref. No. 6) inside the  

 

upright posts, with the flange on the floor before inserting the  

 

next shelf support in the front bottom. Place the four plastic feet  

 

(Ref. Nos. 7) on the bottom of the uprights to aid 

1.

 

The reference numbers used throughout this sheet refer to  

 

the illustration on the back cover. This is to help you to    

 

identify the various parts as they are mentioned.

3.

 

Place the shelf reinforcement (Ref. No. 4) on the shelf  

 

 

supports making sure that the gooves in the reinforcement  

 

are connected securely to the edges of the supports. For best  

 

support, divide the space between the reinforcements and  

 

the uprights into equal spaces.

4.

 

Shelves (Ref. No. 2) should be tilted in as shown below. The  

 

square hole on the side flange of the shelf goes to the rear  

 

of the unit. The round hole on the side flange goes toward  

 

the front of the unit. 

NOTE: If joining units together, use a “T” post adder upright 

instead of an “L” post starter upright.

NOTE: Make sure that all the shelf 

supports are seated properly.

NOTE: The narrow part of the 

keyhole slot on the uprights 

should be toward the floor, 

while the wide part should 

be toward the top.

UP

DOWN

NOTE: Unit includes plastic fee to prevent posts from damaging 

the floor. If you are assembling an Adder unit, you will recieve 

the LTNF-T instead of the LTNF-L as show above.

Отзывы: