Operating Procedures Continued
STARTING -
SP VS (GFCI COMPATIBLE)
1.
Check that the toggle switch is set to STOP.
2.
Plug the blower cord into power source receptacle. If power is properly brought to the
control, the “ON” LED and the “STOP” LED indicators will be lit.
3.
Engage START toggle. The toggle is momentary switch to start. The center position is
the run location.
4. Adjust the rheostat knob to the desired speed/load.
STOPPING
Stop unit before unplugging from power source. Make sure toggle is set to STOP.
NOTE:
SP VS GFCI systems are set to run on
the cord length and size specified at the
time of purchase. If you wish to run the
unit on a different size/length cord than
originally requested, the fan’s drive may
need to be reset. The SP VS is available in
three settings, which may be changed at
anytime. For information on how to adjust
the set cord length and size, please contact
TEMPEST TECHNOLOGY CORP.®
A) 15’ of 12 AWG
B) 200’ of 10 AWG
C) 200’ of 12 AWG
SP VS Controller
Page 10
Содержание LAMINAR ELECTRIC - LE
Страница 14: ...Notes Page 13...
Страница 15: ...Notes Page 14...
Страница 16: ...Notes Page 15...
Страница 17: ...Notes Page 16...