![TELink BLE 1x6 Test System 3.2 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/telink/ble-1x6-test-system-3-2/ble-1x6-test-system-3-2_assembly-and-maintenance-manual_1083562014.webp)
Assembly And Maintenance Manual for Telink BLE 1x6 Test System 3.2
AN-18071200-E1
13
Ver 1.0.0
2.3
Cable connection
2.3.1
Test sites on Main board
As shown in Figure 14, the top side of the Main board contains six independent
test sites (marked as Site0~Site5 from left to right). Note that the arrow should be
placed towards right.
Figure 14 Top silk-screen sketch of Main board
Each Site on the Main board contains HDMI connector, connector A, flange plate
and connector B from top to bottom. Connector A and B are featured with dual rows,
2.54mm spacing and 2x12pin.
Telink adopts a HDMI cable to connect a thimble board with HDMI connector on
corresponding test site of the Main board, and adopts a gray flat cable to connect a
Display board with corresponding connector B of the Main board.
Please refer to Appendix 3 for illustration of test pins on the main board.
The arrow indicates direction
to place main board.
RF connector negligible to user
Telink
for
customer