![Teledyne GaN PowerMAX Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/teledyne/gan-powermax/gan-powermax_manual_1080379013.webp)
PAGE 13 OF 16
214578 REV A ECO 18422
GaN PowerMAX
Second Generation GaN
Modular N+1 Phase Combined System
System Outline Drawing
The system pictured below is typical for an 8-Module C-Band system.
Note that certain power levels require a different power supply configuration. Consult with the factory
for details on your system’s prime power requirements.
23.31
[592.13]
76.25
[1936.75]
2RU FILLER
4RU FILLER
2RU FILLER
1RU PS2
1RU VENT
1RU PS1
1RU VENT
3RU SSPA 1
3RU SSPA 2
3RU SSPA 3
3RU SSPA 4
1RU RF DIST.
3RU SSPA 5
3RU SSPA 6
3RU SSPA 7
3RU SSPA 8
3RU FILLER
LEVELING
FEET (4X)
80.29
[2039.29]
77.63
[1971.68]
42.00
[1066.80]
38.25
[971.57]
13.97
[354.73]
1/4-20 UNC
CABINET
GROUND STUD
OPTIONAL
AC DISTRIBUTION
INPUT TERMINAL BOX
10x12x4 [254x304x101]
RF OUTPUT
CPRG137 WITH
THRU HOLES
OPTIONAL
16 PORT
ETHERNET
HUB
PASSIVE
POWER
COMBINER
PASSIVE
POWER
COMBINER
OPTIONAL 5RU
AC DIST. CIRCUIT
BREAKER PANEL
POWER
DISTRIBUTION
RAIL