![Teledyne Cetac Technologies SPM-700 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/teledyne-cetac-technologies/spm-700/spm-700_installation-manual_1080894011.webp)
Syringe Pump Module Installation Guide
Chapter 2: Installing the Syringe Module
11
Connecting the Power Supply
It is important to use the appropriate power cord for your country. Use only
the provided power supply. The syringe pump module is typically powered by
a desktop transformer, although some configurations may be powered by
another kind of power supply.
1
Turn the power switches on the power supply, autosampler, and syringe pump
module OFF.
2
Connect the power supply to the 24V port on the back of the syringe pump
module.
3
Check the plug on the power cord to verify that it is of the correct type for your
country.
4
Plug the power cord into a power outlet.
5
Plug the power cord into the power supply.
F
IGURE
2-8
Power Supply
Connecting the Syringe Module to the Autosampler
For many applications, a host PC controls the both the autosampler and
syringe pump module via a single serial or USB connection. The syringe pump
commands are then passed through to the syringe pump module.
You will need a serial cable equipped with two male DB-9 connectors.
1
Plug one end of the cable into the autosampler’s COM 2 port.
When syringe pump commands are received on the autosampler’s COM 1 or
USB port, the autosampler will pass the commands out through its COM 2 port.
2
Connect the other end of the cable to the syringe pump module’s COM port.
3
Finger-tighten both screws of the connectors.
Power Cord to
Grounded AC Power
Outlet
To 24V Connector
on Pump Module