TSBC3000 Series Standalone and TSBC3000 Series 1+1 System Installation Guide
8
Not included:
•
A 19" equipment rack. The TSBC3000 1 unit must be installed in a standard 19" wide
equipment rack.
1+1 Patch Panel
Note
TDM fall-back connection to the PSTN is an optional feature.
One or two 1+1 patch panels are required for the proper connection of each grouping of 8 lines of the
TSBC3000 series 1+1 system.
Cables provided
: You are provided with 16 RJ48C cables (yellow), two meters in length with your 1+1
Patch Panel (8 T1/E1).
Table
2.1
1+1 Patch Panels for TSBC3000-680 +1
1+1 Patch Panel (8/T1/E1)
Provides connection for up to 8 T1/E1 lines from the network to
the 1+1 Patch Panel (8 T1/E1) and then links to the TSBC3000-
680 and TSBC3000-680 +1
Cables provided:
You are provided with 16 RJ48C cables (yellow), two meters in
length, per 1+1 Patch Panel (8 T1/E1) you receive.
Содержание TSBC3000
Страница 1: ...Installation Guide TSBC3000 Session Border Controller August 31 2016...
Страница 41: ...35 Installing the Equipment 3 Select a host from the Host Configuration List 4 Select the Status tab...
Страница 50: ...TSBC3000 Series Standalone and TSBC3000 Series 1 1 System Installation Guide 44...