9
Installing the Equipment
2.2
Rack Mounting the 800 Series Standalone or the 800 Series
1+1 System
The 800 series equipment is mounted on a customer provided equipment rack using the mounting
hardware packaged in the box.
2.2.1
Prerequisites
To rack mount the equipment, you will need:
•
One 19” customer-provided equipment rack. The rack must be solidly anchored to the floor with
appropriate support at the top of the racks.
•
Climate controlled room: 0 to +50 Celsius, 0 to 95% non-condensing humidity.
2.2.2
Vertical Placement of the Equipment
The 800 series standalone, 800 1, and 1+1 Patch Panel are each housed in a 1U chassis, as
tabulated in
9. It is important that you provide for enough room on the equipment rack
to allow for the installation of the equipment.
Consider the available space on your equipment rack and the height of the 800 series gateway
equipment. Due to the rear-exhaust heat vents and the efficient heat dissipation design, there is no
need to leave any physical vertical space above or below the 800 series gateway equipment on the
equipment rack.
Table
2.2
800 Series Gateway Physical Height
Model Number
Vertical Height
800 series standalone
1U (1.75 inches or 44.45 mm)
800 1
1U (1.75 inches or 44.45 mm)
Patch Panel (one or two)
1U (1.75 inches or 44.45 mm)
Содержание 800 1+1 series
Страница 1: ...Installation Guide 800 Series Gateway Standalone 800 Series Gateway 1 1 October 26 2015...
Страница 37: ...31 Installing the Equipment 3 Once you confirm the changes a progress page is displayed...
Страница 39: ...33 Installing the Equipment 3 Select a host from the Host Configuration List 4 Select the Status tab...
Страница 46: ...800 Series Standalone and 800 Series 1 1 System Installation Guide 40...
Страница 54: ...800 Series Standalone and 800 Series 1 1 System Installation Guide 48...