Performance Tests
TDS 500B, TDS 600B & TDS 700A Performance Verification and Specifications
1–83
Figure 1–40: Sync Duty Cycle Test: Critically Adjusted Pulse
H
Press TRIGGER MENU.
H
Press the main-menu Type pop-up until you select Video.
If the TRIG’D LED is not lighted, check that the CH1 – Width and
CH1 Period measurements are adjusted correctly. See note above.
CONFIRM that the setup is correct and the oscilloscope will trigger.
H
CONFIRM that the TRIG’D LED is lighted and the waveform is
stable.
H
Disconnect the signal source from CH1, wait a few seconds, then
reconnect the signal.
H
CONFIRM that the TRIG’D LED is lighted and the waveform is
stable.
H
Press Sync Polarity.
H
Press Pos Sync.
H
Push the pulse generator COMPLEMENT button out.
H
CONFIRM that the TRIG’D LED is lighted and the waveform is
stable.
Содержание TDS 500B
Страница 4: ......
Страница 6: ...Table of Contents ii TDS 500B TDS 600B TDS 700A Performance Verification and Specifications ...
Страница 10: ...General Safety Summary vi TDS 500B TDS 600B TDS 700A Performance Verification and Specifications ...
Страница 12: ...Preface viii TDS 500B TDS 600B TDS 700A Performance Verification and Specifications ...
Страница 13: ...Performance Verification Procedures ...
Страница 14: ......
Страница 18: ...Performance Verification Procedures 1 4 TDS 500B TDS 600B TDS 700A Performance Verification and Specifications ...
Страница 32: ...Performance Tests 1 18 TDS 500B TDS 600B TDS 700A Performance Verification and Specifications ...
Страница 102: ...Performance Tests 1 88 TDS 500B TDS 600B TDS 700A Performance Verification and Specifications ...
Страница 103: ...Specifications ...
Страница 104: ......
Страница 118: ...Nominal Traits 2 14 TDS 500B TDS 600B TDS 700A Performance Verification and Specifications ...
Страница 126: ...Warranted Characteristics 2 22 TDS 500B TDS 600B TDS 700A Performance Verification and Specifications ...
Страница 133: ......
Страница 134: ......