OPERATION
95
Setting the Test Sequence Settings
Steps
The test sequence settings (T-01~T-04) are set
with the Utility key.
1.
Press the Utility key. The Utility
key will light up.
2.
The display will show T-01 on the top and the
memory no. for T-01 on the bottom.
Test Sequence
Setting
Memory
number
3.
Rotate the voltage knob to select
below items.
Voltage
Test sequence Run
Test sequence Load
Test sequence Export
Test sequence Remove
T-01
T-02
T-03
T-04
4.
Rotate the current knob to choose a
memory slot number.
Current
Range
1~10
5.
Press the Voltage knob to complete
the setting.
Voltage
Содержание Keithley 2260B Series
Страница 5: ...Series 2260B Multi Range Programmable DC Power Supplies USER MANUAL ISO 9001 CERTIFIED MANUFACTURER ...
Страница 14: ...2260B Series User Manual 10 Considerations 33 Grounding 36 ...
Страница 43: ...OPERATION 39 Remove Test Sequence 99 Test Sequence Error Messages 100 ...
Страница 52: ...2260B Series User Manual 48 Removal Reverse the procedure to remove the terminal covers ...
Страница 111: ...CONFIGURATION 107 Note Power On and Calibration settings can only be set during power up ...