2-37
Installation
Frame Module Installation
The Model 4000 switcher is shipped fully configured with all the standard and
ordered optional modules already installed in the Signal Processor Frame.
The Frame is divided into four “bays”, labeled Bay A (top front), Bay B (bottom
front), Bay C (top rear) and Bay D (bottom rear). The modules slide into the frame
bays, plugging into connectors attached to the main motherboard in the frame. The
correct location of each module is indicated on a designation strip above the top
bays A and C.
Module Installation and Removal
To insert a module, slide it slowly into the correct location, avoiding contact with
the modules on either side. Be sure to match the rear connectors before applying
pressure to seat the module.
To remove a module from the front A and B Bays, pull up on the upper and lower
plastic ejector tabs and pull the module out slowly avoiding contact with the
modules on either side. See
0621-207
Figure 2-22. Removing a Module From the A or B Bays
Содержание Grass Valley 4000
Страница 3: ...iii Tektronix Grass Valley Products P O Box 1114 Grass Valley CA 95945 916 478 3800 ...
Страница 4: ...iv Tektronix Grass Valley Products P O Box 1114 Grass Valley CA 95945 916 478 3800 ...
Страница 34: ...1 20 Section 1 System Overview ...
Страница 138: ...2 104 Section 2 Installation ...
Страница 196: ...3 58 Section 3 Functional Description ...
Страница 286: ...Index 6 Index ...