![Tektronix GeoProbe G10 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/tektronix/geoprobe-g10/geoprobe-g10_installation-manual_1077380009.webp)
G10 Installation Guide 7.13.2
9
1
G10 New Installation and Upgrade Workflows
Rev. 005-140228
The following table lists the supported components in a G10 standalone configuration. RTM
installation varies depending on the specific configuration. Refer to
for install and upgrade details.
Figure 1.1
shows the front view of the G10 probe components for the IIC200 configuration.
Figure 1.1 - G10 Probe Front
shows the rear view of the G10 probe components for the IIC200 configuration.
Figure 1.2 - G10 Probe Rear
G10 Chassis
Slot 1 (Bottom)
IAP320 blade (front) and PRM300 RTM (rear) OR
IAP200 blade (front) and PRM200 RTM (rear) OR
IAP100 blade (front) and PRM100 RTM (rear)
Slot 2 (Top)
IIC200 blade (front) and either SRM200 RTM or TRM100 RTM (rear) [IIC200/
TRM100 RTM only used for eHRPD monitoring]
IIC100 blade (front) and either TRM100 RTM or SRM100 RTM (rear)
The IIC100/IAP320 is not a recommended configuration and is not officially
supported for qualified performance ratings. Tektronix Communications
recommends upgrading systems to IIC200 when upgrading to the IAP320.
Fuse Panel (DC units only)
SAS Storage Enclosures (Controller and Expansion)
SA200R - One controller enclosure supports seven JBOD expansion enclosures.
Due to the increased
performance of the SA200R, only one controller enclosure is required for a deployment using this model.
SA100R - One controller enclosure supports three JBOD expansion enclosures.
Tektronix Communications | For Licensed Users | Unauthorized Duplication and Distribution Prohibited