VOT45; Rev 1.1; EN; 10.12.2014
TKT68C
– Installation and maintenance
13
If battery voltage is below deep discharge limit,
push forced charge button from charger, see
instructions in chapter 5.3.2.
Check that temperature sensor is connected
properly and it is working. Resistance should be
about 2 kOhm. Voltage over sensor should be
about 5 Vdc.
6 RECHARGE
When this LED is flashing, the
battery is recharging but the voltage
has not yet reached the
maintenance voltage.
When this LED is lit, the battery
voltage has reached the
maintenance voltage.
After a power failure the batteries
are first boost charged using a
constant current. The boost
charging and the cyclic charging
normally take 12 hours, after which
the device switches to trickle
charging, i.e. the normal mode. In a
normal mode, the battery voltage is
kept in about 243 V (N = 261 V).
The charging current can be
selected from the charging board by
using a DIP switch.
7 CURRENT
LIMIT
Not in use
8 BATTERY
FAULT
Possible fault in the battery or its
cabling.
This LED can be lit with other LEDs
that indicate the fault more
specifically.
If the battery is disconnected, the
charger doesn’t charge, the battery
fuse is blown or the battery does
n’t
accept charging current, the
following alarms are displayed on
the panel:
Mains operation
LED
Battery undervoltage
or
overvoltage
LED
Battery fault
LED
Internal fault
LEDs
Battery fuses might be blown.
Refer to the instructions given for the LED that
specifies the battery fault (Battery overvoltage,
Battery undervoltage and Deep discharge).
To reset the possible battery fault alarm, press the
Reset / Test
button.
9 EARTH
LEAKAGE
Possible earth leakage inside the
central battery unit.
Earth leakage detection will check if positive pole
of the battery has leakage to the body of the
central battery unit.
If there is not earth leakage, the earth leakage
sensor might be broken.
Содержание TKT68C
Страница 39: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 39 APPENDIX 2 Mechanical dimensions...
Страница 42: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 42...
Страница 43: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 43...
Страница 44: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 44...
Страница 45: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 45...
Страница 46: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 46...
Страница 47: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 47...
Страница 48: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 48...
Страница 49: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 49...
Страница 50: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 50...
Страница 52: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 52...
Страница 53: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 53...
Страница 54: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 54...
Страница 55: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 55...
Страница 56: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 56...
Страница 57: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 57...
Страница 58: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 58...
Страница 59: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 59...
Страница 60: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 60...