background image

 

 

 

 
 

 

VOT45 

 

TKT68C 

TAPSA CONTROL

 

CENTRAL BATTERY UNIT 

FOR EMERGENCY LIGHTING 

 

Installation and maintenance instructions 

 

 

 

 

 

Made In Finland 

Содержание TKT68C

Страница 1: ...VOT45 TKT68C TAPSA CONTROL CENTRAL BATTERY UNIT FOR EMERGENCY LIGHTING Installation and maintenance instructions Made In Finland...

Страница 2: ...3 Circuit board settings 9 4 4 Parallel connection of output circuits 9 4 5 Control unit 10 4 5 1 Individual luminaire monitoring test with basic settings 10 4 5 2 Circuit monitoring luminaire test wi...

Страница 3: ...ry 33 8 1 6 Error log 34 8 1 7 Setup 35 8 1 8 External USB connection 35 8 2 Printer 36 8 2 1 Language selection of the printer TKT68xxC N D L or optional feature TST6831 36 8 2 2 Printing out test re...

Страница 4: ...unit de energized The central battery unit and the battery housing can be opened only by electrically skilled person Device must be made de energized before any maintenance or repair work Remove the...

Страница 5: ...Control function CD Control and printer CL Control and LCD display CO Control and LON interface CDL Control printer and LCD display CLO Control LCD display and LON interface N Charging for NiCd batte...

Страница 6: ...rcuit monitoring 7 segment display a short operation test time can be set to take place after each 1 7 days battery test every 6 months 4 1 and 4 7 at 0 00 o clock tests can also be started manually r...

Страница 7: ...xxx 2x16 A plug fuse S 16 A 250 V Neozed Battery Fuse TKT6816C P xxx 2x35 A plug fuse S 35 A 250 V Neozed Battery Fuse TKT6816C P xxx 2x35 A plug fuse S 35 A 250 V Neozed Charging circuit fuses 5x20 m...

Страница 8: ...pplied in designing and manufacturing the central battery unit Quality ISO 9001 2008 certified quality system Environment ISO 14001 2004 certified environment system Electrical safety 2006 95 EY LVD d...

Страница 9: ...switch selector that defines the characteristic of the board The functions of the DIP switches are DIPs 1 3 give the board its internal address DIP 4 defines whether the board uses addressable centra...

Страница 10: ...gs and 4 11 Buttons 4 5 1 Individual luminaire monitoring test with basic settings As a basic setting the luminaire test is done automatically once a day at a predetermined time The central battery un...

Страница 11: ...e menu functions of LEDs 1 and 2 are so called basic functions All other functions are related to the settings of the central battery unit The latter do not need to be changed in normal use When the m...

Страница 12: ...tion Battery fault and Internal fault LEDs are also lit Battery charger is charging batteries with too high voltage Charger is faulty and it must be changed and or Batteries are at the end of their li...

Страница 13: ...V The charging current can be selected from the charging board by using a DIP switch 7 CURRENT LIMIT Not in use 8 BATTERY FAULT Possible fault in the battery or its cabling This LED can be lit with ot...

Страница 14: ...naires Status of the luminaires 2 To indicate selection in menu Instructions how to check and change settings from menu are below Addressable monitoring The LEDs display the status of luminaires in th...

Страница 15: ...ontroller function or the BLINK mode 8 Start the local controller function 9 Start the BLINK mode 10 Reconfiguration To start or interrupt a test 1 Go to the menu with the MENU OK button 2 Press the B...

Страница 16: ...ual tests 3 segments display The first section in the 3 segment display determines every how often the luminaire test is made from 1 to 7 meaning the number of days If the number is 1 the test is made...

Страница 17: ...be changed all the way up to 150 mA In the display this shows as the value 30 When the value 30 is exceeded the following value is the minimum current the change of which the central battery unit noti...

Страница 18: ...ked to a specific central battery unit if there are more than one central battery units in the building To set an individual number for the unit 1 Go to the menu with the MENU OK button 2 Press the BR...

Страница 19: ...o set the system time and date 1 Go to the menu with the MENU OK button 2 Press the BROWSE button until the right led is lit 3 Press the SET button until the value you wish to select shows in the disp...

Страница 20: ...eeded unless the test fails If the test fails check condition of batteries To run the battery test yourself either 1 Press the BROWSE button for 8 seconds or 1 Press the MENU OK button 2 Use the BROWS...

Страница 21: ...etween connectors 68 69 FUSE FAULT If the LED is lit there is a faulty fuse in the control module If the LED is blinking slowly there is a faulty fuse in the circuit shown on the display If the LED is...

Страница 22: ...hanging a desired setting in the menu Press for 3 seconds to start luminaire test Press for 8 seconds to start battery test 1 s V METER Press and hold SET for 1 second the voltage of the battery is di...

Страница 23: ...aire 5 1 2 Circuit monitoring Circuit specific condition monitoring allows the usage of any emergency luminaires operating on AC DC voltage However in case of the fluorescent lamp luminaires they shal...

Страница 24: ...inaire circuit As factory setting all circuits are connected as maintained exit luminaire or Local Controller If you wish to change into non maintained emergency luminaire circuits the Mode link needs...

Страница 25: ...0 12 2014 TKT68C Installation and maintenance 25 5 2 1 Parts layout Dip switches for XST2618 and XST0201 Mode links Battery fuses F2 and F3 Distribution fuse F1 or F1 L1 L3 in F models Connectors X1 3...

Страница 26: ...connection wiring for circuit board 1 1400 W 4 circuits combined parallel connection wiring for circuit board 1 Note If you are using parallel connections please note that all output circuits in same...

Страница 27: ...ircuit board operates according to the addressable luminaire monitoring principle When the DIP switch number 4 is in the ON position the circuit board operates according to the circuit monitoring prin...

Страница 28: ...follows 1 Set the current on the TS5 XST0201 B DIP switch according to the guidelines in the illustration below NOTE The charging current must ALWAYS be set checked based on the number of ampere hours...

Страница 29: ...ng External fault is flashing Checking luminaire circuits on at a time is running As the checking process progresses the LEDs will show the luminaires found in the circuit or the total input power of...

Страница 30: ...ttery unit other than changing the batteries when the specified emergency mode duration is no longer achieved The luminaires need to have their light sources replaced once they have reached the end of...

Страница 31: ...al battery unit depending on the model You can either select a central battery unit that already includes the option or select the option as an added feature depending on the model The options are pre...

Страница 32: ...s Figure 2 LCD after having received configuration data from the central battery system 8 1 3 LCD menu tree When you press the SETUP button the LCD menu tree is displayed You can browse the menu by pr...

Страница 33: ...ver board first select the board using the buttons then confirm your selection by pressing the SETUP button To move back to the higher level menu from the test log press the SETUP button for 1 5 s You...

Страница 34: ...particular log first select the desired log using the buttons then confirm your selection by pressing the SETUP button To move back to the higher level menu from the test log press the SETUP button fo...

Страница 35: ...To move back to the higher level menu from the test log press the SETUP button for 1 5 s NOTE A battery test cannot be started unless the battery set is sufficiently charged Figure 10 Settings and st...

Страница 36: ...election of the printer It is a possible to switch the language of the printing with the DIP switches of the TST3004 unit The TST3004 contains the pre programmed languages English Finnish Swedish and...

Страница 37: ...DISCHARGE CURR 01 20A Current of all circuits in battery use BATT VOLTAGE 249V Voltage of battery on time of printing LUMINAIRE TEST OK 00 00 00 Result and date of last luminaire test BATTERY TEST OK...

Страница 38: ...tion will be automatically reset when the fuse has been replaced with a new one The condition of the output circuits is checked only before the tests The circuit voltages are checked at this time with...

Страница 39: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 39 APPENDIX 2 Mechanical dimensions...

Страница 40: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 40 APPENDIX 3 Connection alternatives for batteries...

Страница 41: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 41 APPENDIX 4 Circuit diagram with 1 phase input and BCM connection...

Страница 42: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 42...

Страница 43: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 43...

Страница 44: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 44...

Страница 45: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 45...

Страница 46: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 46...

Страница 47: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 47...

Страница 48: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 48...

Страница 49: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 49...

Страница 50: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 50...

Страница 51: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 51 APPENDIX 5 Circuit diagram with 3 phase input...

Страница 52: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 52...

Страница 53: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 53...

Страница 54: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 54...

Страница 55: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 55...

Страница 56: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 56...

Страница 57: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 57...

Страница 58: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 58...

Страница 59: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 59...

Страница 60: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 60...

Страница 61: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 61 APPENDIX 6 Central battery unit main diagram 1 phase...

Страница 62: ...VOT45 Rev 1 1 EN 10 12 2014 TKT68C Installation and maintenance 62 APPENDIX 7 Central battery unit main diagram 3 phase...

Страница 63: ...re test automatically battery test manually luminaire test manually battery test automatically 6 Sensitivity 7 Luminaire test time 8 Delay time 9 Cent Number 10 Battery level 11 Duration 12 Years 13 M...

Страница 64: ...t teknoware fi www teknoware fi Emergency lighting unit Telephone Email emexit teknoware fi Export Manager Mr Simo Kurki 358 0 3 883 178 simo kurki teknoware fi Area Manager Mr Pasi Hongisto 358 0 3 8...