![Teknion Livello Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/teknion/livello/livello_assembly-instructions-manual_1076888013.webp)
Section:
Description:
Page No:
Date:
ROUTE CABLES THROUGH SYSTEM LINK
INSTALL FRAME LINK COVER
HABL_
102
4 of 4
May 2017
SYSTEM LINK - HEIGHT-ADJUSTABLE BENCH (HAB) TO INTERPRET
FRAMES & WORKSURFACE
Underside
View
OPTIONAL
Connects to
Interpret
Connects
to HAB
C
STEP 6: Insert the Top Bracket hooks into the vertical slots on the System Link Cover and
allow Cover to slide slightly down..
STEP 5: Route Cables through System Link to electrically connect both systems.