
Section:
Description:
Page No:
Date:
SLID IN TRIM FASTENERS
INSTALL PANEL ADD-ON SCREEN
TLE_558
3 of 8
Sept 2021
PANEL ADD-ON SCREENS
PANELS
leverage
Installation Guides
STEP 4a: Drop the Panel Add-On Screen on top of the Leverage Frame and lock in place with
the Spring Clip and Lock Nuts provided.
STEP 3: Slide in the Trim Fasteners into the bottom track of the sub-assembly.
C2a
C2b
C2c