Teknion Leverage Скачать руководство пользователя страница 1

Panel Add-On Screen - Smooth Felt (KPZA)

Part and Product Identification

Section:
Description:

Page No: 

Date: 

Rev. No:  0

PANEL ADD-ON SCREENS

PANELS

Sept 2021

1 of 8

TLE_558

leverage 

Installation Guides

- Leverage Add on Screen -

Smooth Felt (F03-0989-X) x1

- Alignment Clip PET

(B02-0867) xVaries

Leverage Add on Trim Sub Assm. (N01-5997-X) x1

C1 

- Leverage Add on Trim Cut

Lengths (A23-8380-X) x2

C2 - Hardware Kit

(X01-4273) x1

C2a 

- Trim Fastener

        (D03-0065) xVaries

C2b 

- Through Plate for Leverage

        Frameless Glass
       (A16-2901) xVaries

C2c 

- 5/16-18 Lock Nut Zinc Plate

       (E03-0437) xVaries

C2d 

- Top Trim Connection Clip

       (B02-0202) x1

- Leverage 90 deg Clip

      (B02-0869) xVaries

KPZAB

Both Extended

KPZAE

One Side Extended

KPZAS

Both Standard

C1

A

Содержание Leverage

Страница 1: ...nment Clip PET B02 0867 xVaries Leverage Add on Trim Sub Assm N01 5997 X x1 C1 Leverage Add on Trim Cut Lengths A23 8380 X x2 C2 Hardware Kit X01 4273 x1 C2a Trim Fastener D03 0065 xVaries C2b Through Plate for Leverage Frameless Glass A16 2901 xVaries C2c 5 16 18 Lock Nut Zinc Plate E03 0437 xVaries C2d Top Trim Connection Clip B02 0202 x1 D Leverage 90 deg Clip B02 0869 xVaries KPZAB Both Extend...

Страница 2: ...re edge of Screen lines up with metal rail as per specifications Tighten the Button Head screws STEP 1 Loosen the Hex Socket Button Head screws alongthe side of the extrusion NOTE Ensure that the Torque is between Min 8 5lbf in to Max 14lbf in C1 A NOTE Please Ensure that the Torque is between Min 8 5lbf in to Max 14lbf in NOTE Please Ensure that the Torque is between Min 8 5lbf in to Max 14lbf in...

Страница 3: ...8 3 of 8 Sept 2021 PANEL ADD ON SCREENS PANELS leverage Installation Guides STEP 4a Drop the Panel Add On Screen on top of the Leverage Frame and lock in place with the Spring Clip and Lock Nuts provided STEP 3 Slide in the Trim Fasteners into the bottom track of the sub assembly C2a C2b C2c ...

Страница 4: ... KIT INSTALLATION ON PANELS MANUFACTURED BEFORE JUNE 2011 Sept 2021 4 of 8 TLE_558 PANEL ADD ON SCREENS PANELS leverage Installation Guides STEP 4b Place Compatibility Spacer Plate inside the channel close to the Trim Fasteners Old Panel New Panel ...

Страница 5: ...ANEL ADD ON SCREENS INSTALLATION Sept 2021 5 of 8 TLE_558 PANEL ADD ON SCREENS PANELS leverage Installation Guides STEP 4c For multiple Panel Add On Screens connect them using the Top Trim Connection Clip Install the assembly onto the Panels C2d ...

Страница 6: ... 8 TLE_558 PANEL ADD ON SCREEN PANELS leverage Installation Guides NOTE Please leave a 1 16 gap between Metal Sub Assembly when installing multiple Panel Frames with Extended Front View Top View NOTE Please leave a 1 16 gap between Metal Sub Assembly when installing multiple Panel Frames with Extended ...

Страница 7: ...TINUED Sept 2021 6 of 8 TLE_558 PANEL ADD ON SCREENS PANELS leverage Installation Guides STEP 5 Install Alignment Clips on side to side applications when there is no Extended Option minimum gap NOTE Alignment Clips are provided with the Add on Screen depending on specs B ...

Страница 8: ...nstallation Guides Step 6 Install 90 deg Alignment Clip by pushing it between the two screens NOTE Always install 90 Corner Cover Trim together with the Panel Add On Screen when Extended Screens meet at the corner The Cap of the Corner Cover has to engage into the trims For 90 Corner Cover Trim installation refer to installation guide TLE_205 D ...

Отзывы: