Teka Power Canopy Скачать руководство пользователя страница 2

POWER CANOPY™

Integral Driver - Solid State LED

Standard Installation 

PROJECT:

TYPE:

Phase 1 - Rough In

Installation of Back box

1.  Install conduit and junction box (By Others) 

to be used with this product. 

2.  Install junction box so that front face is flush 

with finished wall or ceiling.

3.  Connect box to conduit and pull wires for 

connections (See Wiring diagram).

Additional Info

•  Please follow National and Local electrical codes for your area. 
•  Suitable for through wire.
•  Suitable for installation into combustible materials.
•  Rated for 90° C.
•  Junction box, universal mounting ring screws, box mounting hardware 

and gaskets (By Others)

IMPORTANT SAFETY INFORMATION LISTED ON REVERSE

READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS

RELEASE DATE

9-13-17

REFERENCE

 

NUMBER

INS-2673-00

WIRING DIAGRAM

Phase 2 - Finish Installation of Fixture with Power Canopy™.

LINE

COM

GROUND

WIRING DIAGRAM

Driver

GROUND FROM FIXTURE

LINE

(+)

Fixture

COM

GROUND

Driver

(-)

GROUND ON PLATE

LINE

COM

4.  Mount canopy to wall plate using four (4) #8-32 

stainless steel button head screws with 3/32” 

Allen wrench. Do not over tighten.

1.  Remove one or two wire entrance knockouts on 

wall plate. Pull primary branch circuit through 

knockout(s). Attach wall plate to junction box 

using appropriate hardware (By Others).  Seal 

plate to wall as per NEC.

2.  Ground primary branch circuit to wall plate per 

NEC.  Make watertight connections from driver 

to primary branch circuit using waterproof wire 

connectors. (By Others) 

See wiring diagram.

3.  Connect fixture to driver with provided quick 

disconnect.

40429 Brickyard Drive • Madera, CA 93636 • USA

559.438.5800 • FAX 559.438.5900 

www.tekaillumination.com • [email protected]

Отзывы: