5
990-630-EN R0
Sentry 6510 Capacity Monitor
Fitting the monitor
Place the monitor inside the driver’s cab in a position where it is easy for the operator to read the display.
1. Mark the mounting position and the location for screw holes as shown in Figure 3.
Figure 3: Monitor mounting bracket position
2. Drill the screw holes and mount the bracket.
3. Attach the monitor to the bracket as shown in Figure 3.
NOTE: The Sentry 6510 Capacity Monitor uses the same connection as the LH500C Combine Computer. If the combine harvester already
has an LH500C installed, simply connect the cable from the monitor to the port on the main cable.
Fitting the junction box
Mount the junction box at the rear of the combine harvester on the right side where it will be well-protected and accessible for connecting
cabling (the main cable, shown in Figure 1, is 10 m long).
1. Lead the cable from the monitor along existing supply mains and hydraulic tubes through the hole in the junction box.
NOTE: Beware of rotating parts, sharp edges and high temperatures (such as from exhaust).
2. Connect the cable to the circuit board as shown in Figure 2.
Connecting the power supply
The supply voltage is 12 Volt.
1. Connect the supply cable to 12 V such that when the combine harvest ignition is turned off, power to the monitor is also turned off.
2. Connect the red cable to the +12 V and the black cable to the ground (0V).
55 mm
05.0