TECNOPLAST ITALY Srl Pag.7
Inspection of the installation and settings
Check list:
Prior to commissioning and initial start-up, it must be guaranteed that:
the fan is installed vibration-free and mechanically secured,
all components are cleaned both on the inside and outside and are free from
foreign bodies,
all intake and delivery ducts are connected in a leak-proof and elastic
manner,
all rotating parts are protected against unintentional contact,
the electrical connections are installed and their function tested,
a lockable main control switch is available to which the fan is connected,
the EMERGENCY-STOP equipment is functionally tested,
the safety inspector has made sure that safety equipment exists,
the operating personnel is familiar with the operating manual,
the safety inspector has given his approval for the operation of the
installation and that external persons are present in the plant area.