
4.3. Grounding for electrostatic breakdown prevention
1. Human body grounding
Use the anti-static wrist strap to discharge the static electricity
from your body. (As shown in Fig. 3 .)
2. Work table grounding
Put a conductive material (sheet) or steel sheet on the area where
the optical pickup is placed, and ground the sheet.
Caution:
The static electricity of your clothes will not be grounded through
the wrist strap. So, take care not to let your clothes touch the
traverse deck (optical pickup).
Fig. 3
5. Operation Checks and Component Replacement
Procedures
- This section describes procedures for checking the operation of
the major printed circuit boards and replacing the main
components.
- For reassembly after operation checks or replacement, reverse the
respective procedures. Special reassembly procedures are
described only when required.
5
Содержание SL-DV290EE
Страница 6: ...5 1 Checking for the DVD module 1 P C B Check the DVD module 1 P C B A side as shown below 6...
Страница 8: ...8...
Страница 12: ...12...
Страница 13: ...13...
Страница 14: ...5 6 Replacement for the disc tray Follow the Step 1 Step 3 of item 5 1 Follow the Step 1 Step 5 of item 5 5 14...
Страница 15: ...15...
Страница 16: ...16...
Страница 18: ...18...
Страница 19: ...19...
Страница 20: ...20...
Страница 21: ...21...
Страница 22: ...22...
Страница 23: ...23...
Страница 24: ...24...
Страница 25: ...25...
Страница 26: ...26...
Страница 27: ...27...
Страница 28: ...28...
Страница 31: ...31...
Страница 32: ...32...
Страница 41: ...41...
Страница 63: ...63...
Страница 76: ...20 Loading Mechanism Parts Location 21 Traverse Mechanism Parts Location 76...
Страница 77: ...22 Schematic Diagram for printing with A4 size K0305 YH HM 77...
Страница 107: ......