9.1.4 - START-UP
• Position the control box button on the desired operating mode.
• Check general installation operation (temperatures, outputs,...).
.
CAUTION:
In order for the automatic heating slope correction system operate at an optimum level, we recommend
that, when starting the installation, the system be operated in
Comfort
heating mode for 2 to 3 days without modifying
the ambient setpoint.
Proceed in the same manner if the correction coefficient was reset. See paragraph 8.1.5.
9.2 - MAINTENANCE
•
Perform the following operations at least once per year
(the frequency of operations depends on the installation and
operating conditions):
- Check the composition and condition of the coolant.
- Check operating points and setpoints.
- Check the safety devices.
- Dust the electrical box.
- Ensure that all electrical connections are properly tight.
- Check the ground connections.
- Verification of the hydraulic circuit (cleaning of the strainer filter and drip pan, water quality, purge, pressure, etc.).
- Verification of the supplementary valve.
• For the generator and the boiler, refer to the instructions specific to these devices.
18
GB
10 - ELECTRICAL DIAGRAM
A1
Heating control board
KA1
Supplementary heating authorisation auxiliary relay
Q1
Control circuit breaker 230 VAC
Component symbols
10 05 826 - 01
A1
4
3
12
L1
3
5
4
2
1
3
1
2
O2
O1
O3
C
A
B
Q1
6A
PE
KA1
KA1
230V
T-
T+
E2
E1
H3
H2
H1
A3
-
D2
D1
+
C
R3
R2
R1
FP
A2
CC
A1
1
3
42
S3
S2
CC
S1
4
3
1
2
4
3
2
1
4
3
2
1
3
2
1
1
2
3
5
43
2
1
2
31
4
1
2
3
4
5
CN4
CN3
CN2
CN1
CN5
CN6
CN7
CN8
C
U
N
U
N
230 V power supply
Boiler
alarm
HP
(Heat pump)
On / Of
f
Default
Boiler
Circulating pump
Supplementary valve
Pilot wire
Supplementary
heating
Inlet
(T
eleinfo) Remote info
Inlet
Load shedding
BUS
BUS
Outdoor sensor
Water return probe
Содержание K 60 D 066 Z
Страница 19: ...GB 19...
Страница 20: ...F GB D I E...
Страница 21: ...F GB D I E...
Страница 22: ...F GB D I E 1918...
Страница 23: ...F GB D I E...