6
4. HOW TO INSTALL THE UNIT
EG
Fig. 4-1
Minimum operation and maintenance area. (fig. 4-1)
Find the place for the installation. The unit can be connected
in four different positions: at the right-back side, at the left-
back side, at the botton on the right or on the left. (fig. 4-2)
Floor installation.
Bend the fullscall diagram, level it and mark the holes to drill
(pipes, condensate drain pipe, cradle). (fig. 4-3)
Wall installation.
Place the fullscall diagram, level it and mark the holes to
drill (pipes and rawl plugs).(fig. 4-4)
Under ceiling installation.
Place the fullscall diagram and mark the holes to drill (pipes
on vertical wall or under-ceiling, condensate drain pipe, rawl
plugs).
In this case the drainage-tube connection cannot be executed
on the back.(fig. 4-5)
Fig. 4-2
Fig. 4-3
250
250
3000
2000
250
250
250
max 400
3000
Fig. 4-4
Fig. 4-5