12
3
Operation Guide
3.1.
OPERATION OVERVIEW
This chapter provides information on how to operate the TP400D through front panel
and WEB GUI. User can select the appropriate operation method to set up the unit.
3.2.
POWERING UP AND INITIALIZATION
Switch on the equipment through the rear power switch, and the unit is powered up and
starts the initialization process.
The LCD screen is lighted up, and display information is as follows:
The initialization takes about 20 seconds to complete, and then the unit shows the IP
address information is as follows:
Before powering-up the device, make sure that all cabling is
correctly connected (refer to chapter 3.4 of this manual). Make sure the
device is correctly connected to the power inlet and is grounded.
If the unit fails to initia
lize and hangs at the “booting” stage,
switching off the device and then powering up again may help. If the device
still fails to initialize, please contact your service representative for help.
3.3.
FRONT PANEL OPERATION
Ways of operation: use the 6 navigation keys on front panel: Up / Down / Left / Right /
Menu / Ok to configure the TP400D parameters. The configuration and settings are
displayed through front panel LCD.
TP400D Transmodulator/Processor
IP: 192.168.001.098
TP400D Transmodulator/Processor
Setting System…