6.4. Check electrical connections for proper torque 

6.4.1  Reason – avoid false signals, shock hazards, and high-resistance connections 
6.4.2  Frequency 

6.4.2.1 

High Vibration Environments (6 months) 

6.4.2.2 

Low Vibration Environments (12 months) 

7.  Storage: 

The discharged module can be stored in the original package in a dry place. Discharge a 

used module prior to storage or shipment. A shorting wire across the terminals is strongly 
recommended to maintain a short circuit after having discharged the module.

 

 
8.  Disposal:  

Dispose of the module according to local regulations and do not place in the trash. 

 

9.  Specifications:  

Refer to datasheets at our website, 

www.tecategroup.com

.

  

10.  Revisions

 

REV 

REVISION DESCRIPTION 

DATE 

RELEASED 

19/06/07 

Changed mounting screws from #8x3/8” to M4x8 T20 drive screws and corresponding torque, and 
terminal screws M5 TO #10-32 

19/06/27 

Added shock and vibration information on page 5 

19/07/25 

 

 

 

 

 

 

 

 

 

Содержание PBLH Series

Страница 1: ...7520 Mission Valley Road San Diego CA 92108 4400 USA Tel 619 398 9700 Fax 619 398 9777 www tecategroup com User Manual PBLH Series PBLH 12R0 87WT PBLH 12R0 100WT PBLH 12R0 112WT PBLH 10R8 150WT...

Страница 2: ...ategroup com 9101380000 C DOCX Page 2 of 8 TABLE OF CONTENTS 1 INTRODUCTION 3 2 UNPACKING AND HANDLING 3 3 INSTALLATION 4 3 1 MECHANICAL 4 3 2 ELECTRICAL 5 3 3 THERMAL PERFORMANCE 6 4 OPERATION 7 5 DI...

Страница 3: ...the carrier immediately Remove the module from the shipping carton and retain the shipping materials until the unit has been inspected and is determined to be operational NOTE The original shipping m...

Страница 4: ...n be as much as 2V When used in series strings this has the potential to cause dangerous electrical shocks 3 Installation 3 1 Mechanical Modules have four clearance holes for mounting screw locations...

Страница 5: ...re proper vibration performance all mounting points should be used for the PBLH modules These modules have been tested to meet the following specifications Shock IEC 60068 2 27 IEC 60601 1 1 Vibration...

Страница 6: ...s or in parallel for higher energy The maximum torque for the mounting screws is 1 13 Nm The energy storage modules have low Equivalent Series Resistance ESR As a result the resistance of the wires co...

Страница 7: ...o be sized and provided with suitable cooling to handle the resulting power dissipation Additionally proper isolation and packaging are necessary to ensure safety 5 3 If the voltage is under 2V connec...

Страница 8: ...original package in a dry place Discharge a used module prior to storage or shipment A shorting wire across the terminals is strongly recommended to maintain a short circuit after having discharged t...

Отзывы: