7520 Mission Valley Road ● San Diego, CA 92108-4400 ● USA ● Tel: 619.398.9700 ● Fax: 619.398.9777 ● www.tecategroup.com
User Manual
PBLH™ Series
PBLH-12R0/87WT
PBLH-12R0/100WT
PBLH-12R0/112WT
PBLH-10R8/150WT
Страница 1: ...7520 Mission Valley Road San Diego CA 92108 4400 USA Tel 619 398 9700 Fax 619 398 9777 www tecategroup com User Manual PBLH Series PBLH 12R0 87WT PBLH 12R0 100WT PBLH 12R0 112WT PBLH 10R8 150WT...
Страница 2: ...ategroup com 9101380000 C DOCX Page 2 of 8 TABLE OF CONTENTS 1 INTRODUCTION 3 2 UNPACKING AND HANDLING 3 3 INSTALLATION 4 3 1 MECHANICAL 4 3 2 ELECTRICAL 5 3 3 THERMAL PERFORMANCE 6 4 OPERATION 7 5 DI...
Страница 3: ...the carrier immediately Remove the module from the shipping carton and retain the shipping materials until the unit has been inspected and is determined to be operational NOTE The original shipping m...
Страница 4: ...n be as much as 2V When used in series strings this has the potential to cause dangerous electrical shocks 3 Installation 3 1 Mechanical Modules have four clearance holes for mounting screw locations...
Страница 5: ...re proper vibration performance all mounting points should be used for the PBLH modules These modules have been tested to meet the following specifications Shock IEC 60068 2 27 IEC 60601 1 1 Vibration...
Страница 6: ...s or in parallel for higher energy The maximum torque for the mounting screws is 1 13 Nm The energy storage modules have low Equivalent Series Resistance ESR As a result the resistance of the wires co...
Страница 7: ...o be sized and provided with suitable cooling to handle the resulting power dissipation Additionally proper isolation and packaging are necessary to ensure safety 5 3 If the voltage is under 2V connec...
Страница 8: ...original package in a dry place Discharge a used module prior to storage or shipment A shorting wire across the terminals is strongly recommended to maintain a short circuit after having discharged t...