5 Operation
This chapter describes how the Te-VacS is installed and gives instructions on initial
operation.
5.1 Process Validation
For all applications of the Tecan instrument, the user must ensure that the
requirements of each protocol are carefully observed.
A systematic approach of risk analysis, validation of critical parameters and system
validation should be followed to ensure that the system or combination with kit
provides reliable and reproducible performance.
Ensure that the validation process is executed according to national laws and
standards.
5.2 Putting into Operation
5.2.1 Mounting the Base Plate Vacuum Block
To mount the base plate vacuum block, proceed as follows:
1. Place the base plate vacuum block on the instrument’s worktable.
2. Screw in the positioning pins (A) to the corresponding threaded bore holes in
the vacuum block.
A
A
A
A
A
A
A
A
Illustration 11:
Screw in the positioning pins
For the standard version use a total of four pins and place them opposite to the
gripping device access site (B). Otherwise, the gripping device’s gripper fingers
may collide with the positioning pins (C).
B
C
Illustration 12:
Vacuum block pins