ADCP-96-088 • Issue 2 • 6/2013
Page 16
© 2013, Tyco Electronics Corporation. All Rights Reserved.
Figure 9. Constructing the Concrete Pad for the 864 Termination FDH 3000 Pedestal-Mount Cabinet
A template is provided with the PMF kit. The template may be used to determine the cable
conduit locations. Place the template over the top of the PMF and align corner holes in the
template with the center holes in the PMF as shown in
. The 4-inch holes punched in
the template show the locations for the conduit within the PMF.
64 IN
(162.6 CM)
64 IN
(162.6 CM)
6 IN.
(15.2 CM)
4 IN. MIN.
(10.2 CM)
COMPACTED SOIL
21712-E
TOP OF PMF SHOULD
BE FLUSH WITH TOP
OF CONCRETE
90 BEND IN DUCTS
(LOCATE 1-2 INCHES
BELOW TOP OF PAD)
TOPSOIL OR
DECORATIVE ROCK
GRADE
7.6 IN
(19.1 CM)
2
3
IN
(5
8
.4 CM)
3
.2 IN
(
8
.1 CM)
26.9 IN
(6
8
.4 CM)
REINFORCED
CONCRETE PAD
21.9 IN
(55.7 CM)
DO NOT POUR CONCRETE INSIDE
THE PAD MOUNT FRAME
PAD MOUNT FRAME
CAST IN PLACE
GROUND ROD
(LOCATE 1 - 2 INCHES
BELOW TOP OF PAD)
SAND OR GRAVEL
CABINET FRONT
7.4 IN
(1
8
.9 CM)
B
A
4 IN DUCTS FOR LEFT SIDE
FEEDER/DISTRIBUTION CABLES
(USE DUCT A FOR LEFT SIDE
FACTORY-INSTALLED FEEDER)
4 INCH DUCTS FOR RIGHT SIDE
FEEDER/DISTRIBUTION CABLES
(USE DUCT B FOR RIGHT SIDE
CUSTOMER-INSTALLED FEEDER)