INSTALLATION DETAILS
DETAIL
X
FLUSH PIPE PENETRATION
The following technique is used when it is desirable to have the inlet and outlet piping as close
to the collector as possible. It is usually used when the collector is installed flush to a roof, as in
tile roof installations.
Sweat a ¾” copper 90° short radius “L” directly onto the inlet and outlet connections of the
collector. Protect the collector’s rubber pipe grommets from the soldering torch flame and heat
with a wet rag or some other heat shield device. The roof Jack flashing for the pipe might have
to be trimmed so as not to interfere with the collector and its watertight sealing strip.
GROMMET
1-1/4” TO 1-1/2”
¾” 90 “L” SHORT RADIUS
CAP
FLASHING
ROOF SEALANT
SOLDER