background image

TCS900004, Rev.4

 

07/12/2016

 

Check us out at 

www.TCSmeters.com

 

Page 3 

Receipt & Inspection 

Upon receipt of meter shipment, be sure to inspect the packaging and the flow meter assembly for any damage 
before  signing  the  receipt  of  the  shipment.    Notify  the  delivery  company  about  possible  damage  and  refuse      
receipt of the shipment.

 

 

Meters  are  individually  boxed  and  are  protected  with  packing  material.    Each  package  is  identified  with  the 
flow meter assembly part number, description, direction of flow and serial number.  Verify the meter model is 
the   correct model, size, and configuration as ordered. Contact your distributor if there is any discrepancy or         
question.

 

 

Meter  assemblies  should  be  handled  with  appropriate  methods  for  the  awkwardness  of  size  and  weight         
involved.  Appropriate clothing and shoes need to be utilized.  Transport the meter package to the installation 
site with    appropriate transportation methods, careful not to damage the flow meter.

 

 

Be careful of any loose or protruding staples from the packaging, as they can be very sharp and may potentially 
cause injury.  

 

 

If  foam  has  been  used  to  protect  meter,  carefully  remove  top  foam  layer  before  attempting  to  remove  meter     
assembly from box.  Foam packaging maybe formed around the meter assembly making it difficult to remove.  
If  meter  is  bolted  to  a  wood  pallet  remove  bolts  while  being  careful  not  to  let  the  meter  tip  over  when  the      
support  has been  removed.    Do  not lift  the  meter  assembly  by  flex  hoses, thermowells,  wires,  pulsers,  or  put   
objects through meter.  Removing meter assembly from packaging without regard to these warnings may cause 
serious injury.

 

 

The  wooden  pallets  and  bases  meet  the  ISPM  15;  Guidelines  for  Regulating  Wood  Packaging  Material  in      
International Trade through the Timber Products Inspection Company (TP #2134).

 

 

Every  effort  has  been  made  to  remove  the  test  fluid before  shipment.    All TCS  flow  meters  are  plugged  and   
enclosed  in  a  plastic  bag.    The  test  fluid  Material  Safety  Data  Sheet  (MSDS)  can  be  reviewed  on  page  50.      
Appropriate precautions should be taken regarding any personal, environmental and material compatibility with 
the end use system.

 

Notice 

Total Control Systems (TCS) shall not be liable for technical or editorial errors in this manual or omissions from 
this manual.  TCS makes no warranties, express or implied, including the implied warranties of merchantability and 
fitness  for  a  particular  purpose  with  respect  to  this  manual  and,  in  no  event,  shall  TCS  be  liable  for  special  or     
consequential damages including, but not limited to, loss of production, loss of profits, etc.

 

 

The  contents  of  this  publication  are  presented  for  informational  purposes  only,  and  while  every  effort  has  been 
made  to  ensure  their  accuracy,  they  are  not  to  be  construed  as  warranties  or  guarantees,  expressed  or  implied,     
regarding the products or services described herein or their use or applicability.  We reserve the right to modify or 
improve the designs or specifications of such products at any time.

 

 

TCS does not assume responsibility for the selection, use or maintenance of any product.  Responsibility for proper 
selection, use and maintenance of any TCS product remains solely with the purchaser and end

-

user.

 

 

All rights reserved.  No part of this work may be reproduced or copied in any form or by any means 

 graphic, 

electronic or mechanical 

 without first receiving the written permission of Total Control Systems, Fort Wayne, 

Indiana USA.

 

Содержание 700-20

Страница 1: ...TCS900004 Rev 4 07 12 2016 Check us out at www TCSmeters com Cat alogTitle Catalog Subtitle Installation Operation Maintenance Manual 700 40 45 Rotary Meter...

Страница 2: ...wledge for all systems maintenance and operation procedures If you have any questions please consult the factory Safety Warning Symbols 2 Receipt Inspection Notice 3 Meter Specifications Meter Types M...

Страница 3: ...rious injury The wooden pallets and bases meet the ISPM 15 Guidelines for Regulating Wood Packaging Material in International Trade through the Timber Products Inspection Company TP 2134 Every effort...

Страница 4: ...rate at close tolerances to one another and the wall of the fluid chamber There are slight clearances between the rotors and the chamber wall Because of this it is important that the meter be properly...

Страница 5: ...l Gasoline Fuel Oils Diesel Bio Diesel Kerosene Vegetable Oils Motor Oils Naptha Ethylene Glycol etc SPD Standard Petroleum Ductile Iron For metering refined petroleum products such as Ethanol Methano...

Страница 6: ...PTFE PTFE Meter Selection The flow meter must be carefully chosen from the Meter Selection factors in the Engineering Manual The meter must be selected based on the operating system and product charac...

Страница 7: ...be mounted between the meter and any valves tees or any other potential places where air may enter the system 8 The metering system should include a means for calibration Protection From Debris On ne...

Страница 8: ...of this problem In order to eliminate hydraulic shock the valve closure rate must be slowed The use of 2 stage preset control valves or surge suppressing bladders or risers will help reduce or elimina...

Страница 9: ...TCS900004 Rev 4 07 12 2016 Check us out at www TCSmeters com Page 9...

Страница 10: ...TCS900004 Rev 4 07 12 2016 Check us out at www TCSmeters com Page 10...

Страница 11: ...all system components are properly secured and tightened 9 All meter assembly bolts and connections are tight 10 The air eliminator vapor release must be properly vented to atmospheric pressure and p...

Страница 12: ...the drive gear of the packing capsule assembly Reinstall the screw and cover plate The meter will now be set up for right to left flow See Page 22 for a parts breakdown of entire meter assembly 14 Wh...

Страница 13: ...test a meter is in its normal operating position instead of a test stand In this way the correctness of the installation and of the operating conditions of the system will be verified by the test Alwa...

Страница 14: ...s only for special instances as determined by weights and measures officials Changing Meter Calibration Refer to meter literature for method of changing meter calibration Any change in the meter calib...

Страница 15: ...cent to increase or decrease prover volume Volume on Prover minus Volume on Meter Counter Volume on Meter Counter Page 15 Calibration Adjustment Temperature Correction If the testing conditions are su...

Страница 16: ...from the empty compartment and if top filling close the nozzle or valve at the end of the delivery hose Open the valve from another compartment containing the same product Carefully open the valve at...

Страница 17: ...tep 3 If the meter indication fails to stop entirely for a period of 10 seconds continue to operate the system in this condition for 3 minutes 3 Close the valve from the empty compartment and if top f...

Страница 18: ...e prover The test results may not be valid if product is splashed out of the prover Appropriate attire and protection is required and always use caution 6 Continue the delivery of product at the norma...

Страница 19: ...sive extremely flammable very toxic oxidizing and corrosive Severe injury or fatalities may arise if appropriate safety precautions are not followed 6 Before replacing or cleaning filter strainer scre...

Страница 20: ...t is not recommended to pneumatically test the meter system at any time 14 If any component of the meter system is removed from the system it should be thoroughly flushed with a compatible liquid Afte...

Страница 21: ...TCS900004 Rev 4 07 12 2016 Check us out at www TCSmeters com Page 21 700 40 700 45 Dimensions All measurements are in inches millimeters...

Страница 22: ...TCS900004 Rev 4 07 12 2016 Check us out at www TCSmeters com Page 22 700 40 700 45 Meter Assembly...

Страница 23: ...ont Cover 1 706500 706500 704503 706500 706500 704503 706500 704503 18A Cap Screw 18 704016 704016 704016 704016 704016 704016 704016 704016 19 Rear Cover 1 704550 704550 704553 704550 704550 704553 7...

Страница 24: ...TCS900004 Rev 4 07 12 2016 Check us out at www TCSmeters com Page 24 740 Air Eliminator Strainer Assembly...

Страница 25: ...744010 744010 17C 80M Strainer Basket 1 744015 744015 17D 100M Strainer Basket 1 744025 744025 18 Seal Ring 1 744003 744004 744004 744004 19 Basket Cover STD 1 744050 744053 744050 744053 20 Basket C...

Страница 26: ...TCS900004 Rev 4 07 12 2016 Check us out at www TCSmeters com Page 26 750 40 Hydraulic Preset Valve Assembly...

Страница 27: ...ing 1 754019 754019 754019 15 Cover Gasket 1 704012 704013 704072 16 Piston 1 754020 754020 754020 17 Flat Washer 1 754028 754028 754028 18 Snap Ring 1 754029 754029 754029 19 Valve Body 1 754040 7540...

Страница 28: ...14 193 2 115 9 261 9 157 1 Bolt Nut Size Lubricated Lubricated 740 40 AIR ELIMINATOR STRAINER ASSEMBLY Part Number Description Tool Bolt Nut Size Foot Lbs Newton Meter Unlubricated Lubricated Unlubri...

Страница 29: ...etting on calibration adjuster 3 Note the position of the drive gear either above or below the packing gland pinion Removing the Adjuster 1 Loosen the retaining screws using a standard flathead screwd...

Страница 30: ...racket screws with a hex wrench or socket driver 3 Remove the drain plugs on the front and rear covers using an allen wrench Allow more fluid to drain from the meter Removing Packing Capsule 1 Remove...

Страница 31: ...placement rotor gear place it between the rotor and blocking gear on the meter 2 Use the socket or box wrench to loosen the right rotor gear lock nut Repeat for the left rotor gear lock nut 3 Move the...

Страница 32: ...rotors insert a screwdriver into the notches near the dowel pins 3 Gently pry the bearing plate off the dowel pins and slide out the bearing plate and rotors from the housing Removing Lock Nuts Rotor...

Страница 33: ...a higher volume capacity than what is rated CHAMBER WEAR A Foreign debris similar to sand or sludge has run through the meter B Meter has been operated at a higher capacity and has worn the bearings...

Страница 34: ...ng gears Rotor Gear Timing 1 Slide on blocking rotor gear and position the arrow that it is pointing toward the right displacement gear 2 Align arrow on displacement gear with the arrow on the blockin...

Страница 35: ...otate gears to make sure they turn freely within the housing before proceeding Reinstalling Rotor Gears Lock Nuts 1 Using the spare displacement gear or shop rag position between right displacement ge...

Страница 36: ...he blocking rotor sleeve Tighten all front cover screws 4 Attach rear cover and tighten all screws Reinstalling Counter Support Adjuster Drive Shaft 1 Position the counter support on the front side of...

Страница 37: ...nstalling Adjuster 1 Reinsert the adjuster into the top of the counter support and assuring that it mates with the drive shaft 2 Tighten the screws that secure the adjuster plate to the counter suppor...

Страница 38: ...cation A brush may be used to remove imbedded particles If screen is too dirty to clean then replace the screen 6 Wipe clean the face of the cover plate and seal ring Check O Rings for damage and repl...

Страница 39: ...nator cover plate 2 Remove cover plate 3 Remove valve plate inspect and replace as needed 1 To remove the air eliminator assembly remove the four screws and washers attaching it to the strainer assemb...

Страница 40: ...from the compression spring 7 The components are in the cap and will come out of the valve housing 8 To remove the cap assembly remove the four cotter pins this is only needed when replacing spring or...

Страница 41: ...uide into valve outlet 3 Secure seal and guide with the two screws 4 Turn outlet of valve in downward position 5 Place the flat washer spring and washer on the valve shaft and secure by placing nut on...

Страница 42: ...acer bearing TCS 754060 bearing sleeve TCS 754055 and sleeve TCS 754050 3 Remove seal TCS 754065 4 Inspect and clean seal chamber 5 Apply thin layer of grease to the shaft and seal chamber 6 Install n...

Страница 43: ...ination of hydraulic shock with the use of a two stage slow closing valve an impact absorbing air cushioning device should be used PROBLEM Product flows through meter but register does not operate A G...

Страница 44: ...here For example an incorrectly installed Catch Can reservoir is located lower than the air eliminator itself the reservoir is allowed to become full or the vent is improperly sized There can be numer...

Страница 45: ...re A The mechanical linkage might need to be adjusted moving the Nylon locking nuts forward or backwards to change the closing of the preset valve B The Veeder Root preset may need to be raked or adju...

Страница 46: ...PERCENT EXPOSURE LIMITS CHEMICAL NAME CAS NUMBER IS LESS THAN TLV TWA TLV STEL PETROLEUM 64741 65 7 45 0 100MG M3 HYDROCARBON PETROLEUM 64742 53 6 65 0 5MG M3 HYDROCARBON ITEMS NOT SHOWN ARE NOT LISTE...

Страница 47: ...PRONE TO AGGRAVATION BY EXPOSURE NONE KNOWN PRIMARY ROUTE S OF ENTRY DERMAL INHALATION INGESTION EMERGENCY AND FIRST AID PROCEDURES IN CASE OF EYE CONTACT IMMEDIATELY FLUSH EYES WITH CLEAN WATER FOR...

Страница 48: ...L TO ASSURE TLV IS NOT EXCEEDED PROTECTIVE GLOVES NORMALLY NOT REQUIRED HOWEVER IF HANDS ARE FREQUENTLY IN FLUID WEAR OIL AND CHEMICAL IMPERVIOUS GLOVES EYE PROTECTION SAFETY GLASSES REQUIRED FOR NORM...

Страница 49: ...TORY INFORMATION LAND TDG PROPER SHIPPING NAME PETROLEUM DISTILLATES N O S HAZARD CLASS DIVISION 3 UN NUMBER 1268 PACKING GROUP III THE INFORMATION CONTAINED HEREIN IS TO THE BEST OF OUR KNOWLEDGE AND...

Страница 50: ...TCS900004 Rev 4 07 12 2016 Check us out at www TCSmeters com Page 50 Notes...

Страница 51: ...harges prepaid to TCS together with a written RGA form MSDS sheet and packaging clearly marked with the RGA number All RGA procedures must strictly be followed for safety and quick resolve TCS reserve...

Страница 52: ...TCS900004 Rev 4 07 12 2016 Check us out at www TCSmeters com 2515 Charleston Place Fort Wayne IN 46808 Toll Free 800 348 4753 Phone 260 484 0382 Fax 260 484 9230 Email sales tcsmeters com...

Отзывы: