L2 Repair Document
TCL
Communication Ltd.
Rev.
2002D
Level 2 Repair Document
Page
1.0
26/33
All rights reserved. Transfer, copy, use or communication of this file is prohibited without authorization.
4.5 Reassembly process
Please make reference to the disassembly process for assembly reverse an order of the disassembly
steps.
Attention:
When assembling Main PCBA, make sure the LCD connected firstly.
When assembling Furnished Frame, make sure the Camera and speaker connected firstly.
Before assembling battery cover, please check whether there
’s any deformation or damage for the
buckles; if yes, replace it with a new battery cover.
4.6 Disassembly process evaluation
We list the MARATHON parts disassembly time, technique levels and disassembly methods as below, for
technique levels, Class 1 signifies easy to disassembly, Class 2 signifies normal to disassembly and Class
3 signifies hard to disassembly.
Spare part
Time for
disassembly
Jigs for
disassembly
Difficulty Class
Remark
Battery cover
2s
Class 1
Battery
2s
Class 1
Screws
8s
Screwdriver
Class 1
Furnished Frame
5s
Plastic Flake
Class 1
Keypad
2s
Class 1
Main PCBA
3s
Plastic flake
Class 1
Main Camera
5s
Soldering iron
Class 2
Speaker
5s
Soldering iron
Class 2
LCD
15s
Pry bar
Soldering iron
Class 2
Front Casing
Class 1
5 Disassembly Complete
Actual Spare Part List depends on the CU reference. Please check with RSH website or
Forlog
system for
the spare part list of specific CU.