新建文件夹
(3)Test and Alignment Specification for NT63
Series (v0 01) 170612
Page 7 of 25
1.2.2 MP Step
In case of starting from blanked flash, it’s necessary to write “
V8-N563T01-LF1VXXX
_emmc_writer.bin
”
file via
factory copy in advance.
▪
OAD Stream
To manage quicker mass reflashing on predefined DVB Channel, some licensed IBL tools ('xxx2lli.exe', 'lli2dsm.exe',
dsmmerge.exe …) from Intel byte Inc. might be necessary to create appropriate DVB SSU image. Over some predefine
settings such as repeated data block insertion, null packets size, … that are controllable in configuration file, here below
are mandatory OUI entries structure to prepare DSM-CC carousel image format:
- export CUST_OAD_OUI
0x001C50
- export CUST_OAD_HW_MODEL
0x5395
- export CUST_OAD_HW_VERSION
0x0000
- export CUST_OAD_SW_MODEL
0x0001
- export CUST_OAD_SW_VERSION
0x00
OAD reflashing is managed within 4 steps operation: multiplex detection, DVB transfer, flashing and warm-start.
See Appendix
⑷
“How to upgrade FLASH SW and EEPROM Clone using OAD”
1.3. UART & IR Parser
To use both UART and/or IR parser, TV has to be set in Factory mode with its USB port well connected to suitable
UART device or an IR emitter device correctly facing up TV (see b
elow “Product Assembly - section 2.0” how to
activate “Factory key”).
The UART parser engine is enabled by sending following command “
0xE2
” from host to TV within following presets
115200
/
8
/
n
/
1
.
Once initialized, “
PS
” caption is toggle displayed on bottom left screen (“S” like Serial).
To communicate with TV depending on SIACP revision layout implementation, you need to fulfill UART/IR
commands protocol and format described on enclosed SIACP requirements document (rev. v3.9).
1.4. Project ID Modification
There are different IDs stored in the eMMC depending on different Panels
settings and Models features, but there’s
only one key branching Project ID that includes all.
So, it’s not recommended to modify Panel ID with Hyper terminal as
other ID features may not change!
To modify Project ID, you need to go through
“
Factory menu
Other
Project ID-->Project ID
”, then spin left or
right with RCU “◄
/
►” keys to chose suitable ID (Project name is dynamically refreshed).It is necessary to press “OK”
key for saving the setting.
See Appendix
⑸
“
How to change Project ID with RCU
”
See below is the ProjectID table for reference:
MODEL-LA
ProjectID PanelID
Panel Name
MODEL-AP
ProjectID PanelID
Panel Name
40D2900
1
1
V400HJ6
43D2900
4
4
ST4251B02-1
40D2900
2
2
V400HJ6
Содержание 39S62
Страница 12: ...3 Test and Alignment Specification for NT63 Series v0 01 170612 Page 5 of 25...
Страница 33: ...6 Power Supply Block Diagram 12...
Страница 34: ...5 Chassis Block Diagram 11...
Страница 52: ......