TCF IM-5500 Скачать руководство пользователя страница 9

Installation, Operation & Maintenance Manual

IM-5500

9      

Motor Wiring & Installation

1.  Proper Lockout/Tagout procedures should always be followed as discussed in the 

Safety & Hazard Warnings

 section. Verify that no 

power is on the circuit to which the fan is being connected.

2.  Run appropriately rated wiring for the installation method to the junction box located within the motor housing; only ½” 

knockouts available. 

Downblast Fans: The electrical supply is routed through conduit between the curb cap and motor compartment. 

Upblast Fans: The electrical supply is routed through the vent tube. 

See images below for electrical routing.

a.  Refer to the accessory installation portion towards the end of this manual for additional wiring instructions for various wired 

accessories.

3.  Leave enough slack in the wiring for maintenance accessibility.

Electrical Information

1.  Check the wiring diagrams on the motor for connections.

2. The motor is factory set at the voltage marked on the fan 

nameplate. Check the line voltage with the nameplate voltage 

and wiring diagrams.

3.  The main power wiring should be sized for the ampacity shown 

on the dataplate. Size wires in accordance with the ampacity 

tables in Article 310 of the National Electrical Code. If long wires 

are required, it may be necessary to increase wire size to prevent excessive voltage drop. Wires should be sized for a maximum of 

3% voltage drop.

4. Disconnect switches are not fused. The power leads must be protected at the point of distribution in accordance with the fan 

dataplate.

5.  On fans without a thermal protector integral to the motor (refer to unit or motor dataplate to determine if protector is present) a 

separate overload device is required. Refer to Sections 430-32 of the N.E.C. for sizing.

6.  All units must be electrically grounded in accordance with local codes or, in the absence of local codes, with the latest edition of the 

National Electrical Code (ANSI/NFPA 70). A ground lug is provided as standard in the unit terminal box. Size grounding conductor 

in accordance with Table 250-95 of the National Electrical Code. DO NOT use the ground lug for connecting a neutral conductor.

7. Supply voltage to the power ventilator should not vary by more than 10% of the value indicated on the unit dataplate. Phase 

unbalance must not exceed 2%.

Failure of motor due to operation on improper line voltage or with excessive phase unbalance constitutes product abuse and 

may cause severe damage to the unit’s electrical components.

WARNING

1.  Use copper conductors only.

2.  Protect wiring from sharp edges. Leave some slack in the line 

to prevent damage.

CAUTION

Motor

Junction

Box

Conduit

Field

Wiring

Motor

Junction

Box

Field

Wiring

Vent

Tube

Содержание IM-5500

Страница 1: ...in nature Additional product and engineering information is available at www tcf com REVIEW AMCA BULLETIN 410 PRIOR TO INSTALLATION Table of Contents Exploded View 2 Fan Overview Impeller Rotation an...

Страница 2: ...ing Bird Screen Impeller Shroud Curb Cap Vent Tube Drain Support Brackets Horizontal Support Post Vertical Support Post Upblast Exhaust Fan Models VCU VCUB Downblast Exhaust Fan Model VC Motor Cover M...

Страница 3: ...offer a broad range of end use applications and should be carefully integrated to provide best use Upblast direct drive fans are available with nominal impeller sizes from 8 5 to 19 7 and belt driven...

Страница 4: ...processes that are hot the fan housing could be hot Sharp edges wear protective gloves when handling installing or servicing a fan Fans can operate at high decibel sound levels Wear proper ear protect...

Страница 5: ...VCU fans All Sizes Fans may be lifted using hooks around the four 4 horizontal support posts with a minimum of four lifting straps with spreader bars to ensure that no contact is made with the motor...

Страница 6: ...ith the bearing manufacturer s instructions The drives and belts should be removed if the fan is to be stored for a prolonged period The drives should be labeled for service and stored in a dry place...

Страница 7: ...r details 3 Perform fan pre check See Check Test Start Procedure section for a full checklist 4 Perform installation of any externally mounted accessories that were shipped loose with the fan 5 Remove...

Страница 8: ...e made by sliding the idler pulley along the groove to either tighten or loosen the belt See image to the right c Verify the RPM of the impeller Adjustment can be made via the variable speed sheave at...

Страница 9: ...res are required it may be necessary to increase wire size to prevent excessive voltage drop Wires should be sized for a maximum of 3 voltage drop 4 Disconnect switches are not fused The power leads m...

Страница 10: ...g conditions The standard pillow block bearings on belt driven ventilators are factory lubricated and are provided with external grease fittings Annual lubrication is recommended or more frequently if...

Страница 11: ...line voltage 115V only Never connect across line See Connection Diagrams Minimum Speed Setpoint All controls are factory set to 65V 3V output as standard with an input voltage of 120V If different mi...

Страница 12: ...essary to adjust belt tension do not over tension as bearing damage will occur Recommended belt tension should permit 1 64 deflection per inch of span of the belt at the center of the belt span To fin...

Страница 13: ...ths is suggested 3 All motors supplied with Twin City Fan Blower ventilators carry a one year limited warranty from date of shipment For repairs within the warranty period the motor must be taken to t...

Страница 14: ...les on the curb hinge to the holes on the curb cap This should be on the opposite side of the drain A B Step 2 Insert provided screws to affix the hinge to the curb cap Step 3 Place and install fan on...

Страница 15: ...ex 4 Security Hasp Hinged Step 1 Drill 4 0 19 holes on center curb cap from either corner Step 2 Attach the hasp to the curb cap by using the included 10 hardware Step 3 Drill 4 0 19 holes on center o...

Страница 16: ...of curb base Step 2 Attach chain to outside of curb base with bolt head on inside of curb base Step 3 Use one flat washer under bolt head and one on top of chain Step 4 Use remaining fasteners to atta...

Страница 17: ...ping screws that are fastened to the support post Step 2 Drill holes and install firestat Holes must be near a support post Note The hole drilled in the motor housing must be close to in line with the...

Страница 18: ...ce the insect screen between the fan inlet and the roof or roof curb Fasten with screws or nails if desired Twin City Fan Performance Baffle Installation Step 1 Place the performance baffle between th...

Страница 19: ...g sheet metal screws Roof curbs come with damper trays Grease Box Installation Step 1 Fasten the grease box to the curb cap under the drain using supplied hardware Parts Included Grease Box Cover Grea...

Страница 20: ...erate noise 4 Poor fan inlet conditions 5 Acoustics or sound measurement procedure incorrect Vibration Problems 1 Poor foundation or mounting structure resonances 2 Foreign material attached to rotati...

Страница 21: ...n Check Inspect fan for damage Are the bolts tight Fan Impeller Impeller overlap checked Fasteners tight Impeller rotates freely Bearings Bearings aligned Bearings greased Note Rotate while greasing S...

Страница 22: ...M 5500 Installation Operation Maintenance Manual 22 Date Completed Maintenance Performed By Comments Model Number __________________________ Serial Number __________________________ Fan Maintenance Lo...

Страница 23: ...nstallation Operation Maintenance Manual IM 5500 23 Date Completed Maintenance Performed By Comments Model Number __________________________ Serial Number __________________________ Fan Maintenance Lo...

Страница 24: ...TWIN CITY FAN BLOWER WWW TCF COM 5959 Trenton Lane N Minneapolis MN 55442 Phone 763 551 7600 Fax 763 551 7601 2023 Twin City Fan Companies Ltd Twin City Fan...

Отзывы: