SP60/SP80 User Manual V1.3
TBB Power Co.,Ltd
20
4.4.1 Preparation
Please find in chapter 3.4 of the size of the SP charge controller
Please choose a flat surface and with 4xM6 supplied to install
Before mounting, please loose the screws on front panel to access the connection
compartment.
Please install four feet supplied in the accessory pack on side of the charge controller.
Fig4-2 Illustration of installation
4.4.2 Mounting the SP charge controller
The SP need to be installed vertically
Please place the SP on your preference location and mark the location of four feet.
Screw the four screw on the wall, leaving about 6mm (1/4”).
Hanging the SP on the four screws and screw tight the four screws afterwards.
Please double check the SP was securely mounted on the wall.
Содержание MPPT SP60-150
Страница 2: ...SP60 SP80 User Manual V1 3 TBB Power Co Ltd...
Страница 4: ...SP60 SP80 User Manual V1 3 TBB Power Co Ltd 2...
Страница 18: ...SP60 SP80 User Manual V1 3 TBB Power Co Ltd 16 3 4 Dimension Fig3 4 Dimension of SP60 80 charge controller...
Страница 47: ...SP60 SP80 User Manual V1 3 TBB Power Co Ltd...
Страница 48: ...SP60 SP80 User Manual V1 3 TBB Power Co Ltd...