TB Davies
|
For help or assistance, please call:
029 2132 0000
9
For help or assistance, please call:
029 2132 0000
|
TB Davies
8
5
6
Temporarily screw two planks of wood onto the ceiling
to act as a platform to support the loft ladder housing
unit whilst affixing it to the beams in the loft.
* Please seek professional advice if cutting across joists.
100
400
300
80
80
1
Use a set square on each corner to guarantee a 90° angle. Where necessary use
packers (not supplied) to fill the space between the frame and joists. Use a spirit
level on all horizontal plains to ensure the frame is level. Finally drilling through
part No. 1 and into the joists, make ten 6mm holes at intervals shown in the dia-
gram. Then use the wood screws (not supplied) to affix the frame into position.
40mm Min
Ø6mm Min
70mm Min