Top Surface of Concrete

Top of Rubber Surface

Foundation requirements

General

This net has been designed to allow a rubber safety surface to be used in conjunction

with corner boxes. The surface thickness should be based on the CFH of 1066mm. The

boxes are supplied with a tile glued to the lid, this ensures the finished

ground level is the required 400mm above the concrete.

It is recomended the area is prepared accordingly prior to commencing installation of 

the net.

Equipment & Tools

The following equipment is recommended to assist in the accurate installation of the 

foundation anchors.
1) Laser Level  2) 20m Measuring Tape  3) JCB Excavator  4) Set Timber

5) Manual Tools: Spade, Sledge Hammer, Claw Hammer & Nails

Time Management

Day One:

1) Set out the Area  2) Accurately Position and Excavate Holes

3) Secure Central & Corner Foundation positions for concreting
Day Two:

1) Concrete Steelwork
Day Three*:

1) Final erection of Activity Net

2) Laying of rubber safety surface material

*The foundation should be left for approximately seven days to achieve       maximum 

strength prior to assembling the remaining elements.

Foundation Procedure

Setting Out

There are a total of Eight holes that need to be excavated. These include two centre 

holes (the final position of the central masts) and six holes at each corner (the net 

will be attached to the subsequently concreted corner anchors by means of rigging 

screws supplied).

             All foundation concrete blocks must be at the same level

It is important to maintain 400mm between the finished surface level of the safety 

surface and the top surface level of the concrete.  Once the correct position of the 

holes has been marked prior to excavation, The use of a datum peg is recommended in 

order to easily relocate the exact foundation position (both horizontally and 

vertically) which was originally established during setting out.

Содержание Twin Active 4000

Страница 1: ...e and has been manufactured to exceed the European Playground Standard BS EN 1176 1 2008 The following installation instructions should be adhered to in order that the equipment functions in a safe ma...

Страница 2: ...ding to BS EN 1176 part 11 section 4 3 and therefore a mininum safety surface of 16095x10779 is required Installation instructions The Twin Active 4000 Activity Net is delivered in three sections Sect...

Страница 3: ...Excavate Holes 3 Secure Central Corner Foundation positions for concreting Day Two 1 Concrete Steelwork Day Three 1 Final erection of Activity Net 2 Laying of rubber safety surface material The found...

Страница 4: ...chor Safety anchor positioned in the hole at the rear of the box 355 50 Anchor hole positioned directly above the front of the concrete block Product TwinAct4000 R1 Produced by Tayplay Ltd Product Twi...

Страница 5: ...mix Total volume required 8 512 cubic metres When Installing the four corner anchors it is extremely important to ensure the eyes of the anchor and associated safety anchors are held securely during...

Страница 6: ...w the lifting of the item using only the net as support as this can cause irreparable damage to the net The mast must take the support The certified excavator operator will be able to assist in this o...

Страница 7: ...the masts are vertical 4 When a 50kg weight is applied to the perimeter rope at the swivel connection this should Deflect approximately 100mm as shown below when the net is correctly tensioned Do not...

Страница 8: ...avy use and or is subject to vandalism and should include the inspection of the following as a minimum General equipment and surface cleanliness 1 Equipment ground clearances are maintained 2 Foundati...

Отзывы: