36
Models C708 & C716
Operating Procedures
Step 9
Secure the pump parts in position by sliding the
retaining pin through the cross holes located at one
end of the pump cylinder. (See Figure 40.)
15113
Figure 40
Note:
The head of the retaining pin should located
at the top of the pump when installed.
Step 10
Assemble the feed tube assembly. Slide the check
ring into the groove of the feed tube.
(See Figure 41.)
15133
Figure 41
Step 11
Install one red o-ring on each end of the mix feed
tube, and thoroughly lubricate. (See Figure 42.)
15132
Figure 42
Step 12
Lay the pump assembly, pump clip, cotter pin and
agitator in the bottom of the mix hopper for
sanitizing. (See Figure 43.)
12166
Figure 43
Содержание Wawa C708
Страница 1: ...Models C708 C716 Heat Treatment Soft Serve Freezer Operating Instructions 059061 M 6 17 08...
Страница 71: ...Model C708 057010 27 Rev 2 08...
Страница 72: ...Model C708 057010 27 Inset Rev 2 08...
Страница 73: ...Model C708 057010 33 Rev 2 08...
Страница 74: ...Model C708 057010 40 Rev 2 08...
Страница 75: ...Model C708 057010 58 Rev 2 08...
Страница 76: ...Model C716 059900 27 Rev 2 08...
Страница 77: ...Model C716 059900 27 Inset Rev 2 08...
Страница 78: ...Model C716 059900 33 Rev 2 08...
Страница 79: ...Model C716 059900 40 Rev 2 08...
Страница 80: ...Model C716 059900 58 Rev 2 08...