background image

2022-012-R-0017-A2_Draft 4

11

O  T I M U S

S O R T E R S

Gateway

  

  

 

  

9.    Connect the power cable (A).

10.  Put the power adapter (B) in a wall 

socket.

 

Warning

:  - Make sure that the 

solarpannels, the smart modules and 

the inverter are installed correctly.

      - Before you switch the inverter on or off, 

stop the gateway. Set the power switch 

of the gateway in the off position (0). 

11. Start the inverter. On the inverter, set the 

DC switch to on.

B

A

6

12.  On the 'launch' screen (A), select the 

'launch' button (B). When the system 

onboarding is confirmed, the customer 

receives an e-mail to register to the 

Taylor dashboard.

B
A

10

XXXXXXXXXXXXXXXXXXXXXX

9

XXXXXXXXXXXXXXXXXXXXXX

8

XXXXXXXXXXXXXXXXXXXXXX

7

XXXXXXXXXXXXXXXXXXXXXX

6

XXXXXXXXXXXXXXXXXXXXXX

5

XXXXXXXXXXXXXXXXXXXXXX

4

XXXXXXXXXXXXXXXXXXXXXX

3

XXXXXXXXXXXXXXXXXXXXXX

2

XXXXXXXXXXXXXXXXXXXXXX

1

XXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

GTW

7

13.  Set the switch (A) in the on position. 

The light in the switch comes on.  

 

Note

-  A few seconds may be necessary for 

the system to start. 

-  If a 4G connection is not available, 

use a wired LAN connection. If a wifi 

connection is necessary, please refer to 

Taylor.

A

8

10

Содержание TAYLOR-GTW-2A

Страница 1: ...0017 A2_Draft 4 1 O T I M U S S O R T E R S Gateway Installation manual Taylor Technologies BV Torenallee 32 14 5617 DB Eindhoven The Netherlands tel 31 0 85 107 1871 mail support taylor solar web www taylor solar ...

Страница 2: ... Connect to the inverter 3 3 Packaging 4 4 Description 5 4 1 Overview of the system 5 4 2 Overview of the gateway 5 4 3 Data cables delivered seperate from gateway 5 4 4 Status shown by the indicator light in the power switch 6 4 5 Status shown by indicator lights 1 and 2 6 5 Installation 7 5 1 Preliminary equirements 7 5 2 Install the gateway 8 6 Declaration of conformity 11 7 Technical specifica...

Страница 3: ...this document 2 Read the safety chapter and make sure that you know all the instructions 3 Do the steps in the procedures fully and in the correct sequence 4 Keep the document in a safe location that you can easily access This document is a part of the equipment 1 3 Language The original instructions of this document are in English EN US All other language versions are translations of the original...

Страница 4: ...s When the photovoltaic array is exposed to light it supplies a DC voltage Read the documentation and safety instructions of the inverter Do not disconnect the junction box under load Do not install the equipment in areas that contain flammable materials or gases Install the equipment in a dry location If the power cable has damage switch off the gateway and remove the power source before you touc...

Страница 5: ...2022 012 R 0017 A2_Draft 4 5 O T I M U S S O R T E R S Gateway A B C E D 3 Packaging A 1Gateway B 1Installation manual C 1Power cable D 1Fastening materials E1 Drill template 4 ...

Страница 6: ...Power connection C Power adapter D LAN connection E Indicator light 1 F Indicator light 2 G PV cable feed through hole H Cable clamp I Power switch with indicator light J Identification plate K Datacable L Cap H C I J G B F E A K D L 2 4 3 Data cables delivered seperate from gateway Data cable Part number P N To use with this inverter A TAYLOR GTW C 00 Goodwe B TAYLOR GTW C SL Solis 4 Description ...

Страница 7: ...ff When the gateway is off the system is in safety mode The cable from the solar string has approximately 1 Volt per solar panel Warning To make sure that the system is in safety mode disconnect the power adapter of the gateway 4 5 Status shown by indicator lights 1 and 2 Indicator light 1 Indicator light 2 Equipment status Flashes 7 times Off There is a connection with the 4G network On Off The g...

Страница 8: ...and the inverter When the photovoltaic array is exposed to light it supplies a DC voltage B A 2 5 Installation 2 Design rules Multiple orientations within one string are allowed Each orientation should reach the start up voltage input DC 7 5 1 Preliminary requirements 1 Scan the barcode of each individual solar panel In the onboarding application on your mobile device On the Scan screen A select t...

Страница 9: ...ction Do not connect parallel module strings per MPPT tracker 1 Scan the gateway Select the SCAN GTW button A A 11 10 9 8 7 6 5 4 3 2 1 4 Note If necessary drill holes Drill safely Do not drill or screw in electricity lines water pipes and such items Use the correct type of wall plugs 2 Install the fasteners Use the drill template on the last page of this manual 3 Attach the gateway to the fastene...

Страница 10: ... cables A either or through the hole B 5 Put the other cable through the clamp C 6 Connect the cables to the inverter D Refer to the documentation of the inverter D 4 7 Connect the data cable to the inverter B Refer to the website www taylor solar Downloads Manuals 8 Connect the data cable to the data connection A B A 5 A B C 3 9 ...

Страница 11: ...ch button B When the system onboarding is confirmed the customer receives an e mail to register to the Taylor dashboard B A 10 XXXXXXXXXXXXXXXXXXXXXX 9 XXXXXXXXXXXXXXXXXXXXXX 8 XXXXXXXXXXXXXXXXXXXXXX 7 XXXXXXXXXXXXXXXXXXXXXX 6 XXXXXXXXXXXXXXXXXXXXXX 5 XXXXXXXXXXXXXXXXXXXXXX 4 XXXXXXXXXXXXXXXXXXXXXX 3 XXXXXXXXXXXXXXXXXXXXXX 2 XXXXXXXXXXXXXXXXXXXXXX 1 XXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXX GTW...

Страница 12: ...tem Specification Value Gateway Input Part number P N TAYLOR GTW 2A Voltage 12 VDC Maximum current 1 5 A Maximum power 18 W Environment IP code IP3X environmental category indoor unconditioned maximum altitude rating 2000 meter Temperature Operating 0 40 C Storage 20 85 C Humidity Operating 8 90 RH Storage 5 95 RH non condensing Frequency bands Cat M B1 B2 B3 B4 B5 B8 B12 B13 B14 B18 B19 B20 B25 B...

Страница 13: ...0Vac input with rated load and 25 ambient Leakage current 0 25 mA 240Vac input protection Over load OCP Fold back Over Voltage OVP Voltage limiting Short Circuit Yes Output to Ground Auto recovery when fault has been removed Short Current Over Current can not exceed 8A max after 1minute at nomi nal line input Protection class II No Load Operation Yes to protect the power supply and system from dam...

Страница 14: ...ts and upon specifications Efficiency Normal 77 6 min 240VAC input Full load Power Consumption Max 0 5W AC nominal Input and Output min load Input Fuse 1A protected against power line surges and any abnormal conditions EMC EMI EN55022 Class B FCC part 15 subpart B Class B EN61000 3 2 2000 EN61000 3 3 1995 A1 2001 EMS IEC61000 4 2 5 8 2001 IEC61000 4 3 2002 IEC61000 4 6 2002 A1 2003 IEC61000 4 4 11...

Страница 15: ...at STC 11 5 Output operational mode Cell string 3 per module Module Nominaloutput current STC 12V Nominaloutput voltage STC 10V 30V Max output current limit 14A Max bypass current 14A Max output voltageif installed on solar module Voc of cell string Voc of solar module Max output voltageif separate from solar module 20V 60V Max output power 475W Max reverse current 0A Output safe mode Output volta...

Страница 16: ...erange junction box 40 C 85 C Output wire 2x 1 2 m 4mm2 standard configuration Connectors MC4 standard configuration Overvoltage category III Pollution degree Pollution 1 for potting part Pollution 2 for non potting part Degree of protection P65 IP67 Protection class II Max system voltage 1000V 15 ...

Страница 17: ... 0003 taylor Drill Template CAUTION Measure the control line X If the control line is not 100 mm do not use this drill template Do not drill or screw in electricity lines water pipes and such items Drill safely Use the wall plugs use a 06 diameter drillbit size and Pozidriv Z1 for driver 8 Drill template 16 ...

Страница 18: ...2022 012 R 0017 A2_Draft 4 18 O T I M U S S O R T E R S Gateway ...

Отзывы: