Service

CGA Connection

Part Number

Inert (N2, Ar)

CGA 295

GL50-8C60

Read the Safety Precautions in the front of this manual before attempting any repairs on
these containers. Also follow these additional safety guidelines while performing con-
tainer maintenance.

Never work on a pressurized container.

 Open the vent valve as a standard practice

during maintenance to guard against pressure build-up from residual liquid.

Use only repair parts cleaned for oxygen service

. Be certain your tools are free of oil

and grease. This is a good maintenance practice, and helps ensure you do not create a
combustion hazard when working on containers for oxygen or nitrous oxide service.

Leak test connections after every repair.

 Pressurize the container with an appropriate

inert gas or leak testing. Use only approved leak test solutions and follow the manufacturer’s
recommendations. “Snoop” Liquid Leak Detector is one approved solution, it is available
from: Nupro Co. 4800 E. 345th St. Willoughby, Ohio 44094 U.S.A.

CONVERTING A CONTAINER TO A DIFFERENT GAS SERVICE

XL-45/50/55 cylinders may be converted from one service to another within the confines of
the argon, nitrogen, and oxygen service for which the containers are designed. Conver-
sion consists of changing the end connections at the USE, LIQUID, and VENT valves;
then changing the liquid level gauge scale by changing its plastic cover; and revising
product decals. Parts are available in kit from for each gas service as illustrated in the
following table.

Service Change Procedure

Before removing any parts, empty the container and open the vent valve to prevent any
pressure build-up in the unit.

1. Remove the LIQUID, VENT, and USE end fittings, one at a time, with standard wrenches.

Install new fittings from the Gas Service Change Kit, using Teflon tape or another
oxygen-compatible thread sealant.

2. Remove the protective cover over the liquid level gauge. Replace the contents scale

with the scale for the new gas service from the service change kit, then replace the
protective cover.

3. Install new fittings for the USE, VENT, and LIQUID connections from the Gas Service

Change Kit. Leak test the fittings you just replaced, and change the gas service de-
cals to complete the conversion.

MAINTENANCE

PROCEDURES

WARNING:
For the O

2

 System

Users: Residue of leak
detectors solutions
can be flammable. All
surfaces to which the
leak detector solutions
have been applied
must be adequately
rinsed with potable
water to remove all
traces of residue.
Reference CGA G-4.
Section 4.9.

Содержание XL Series

Страница 1: ...and XL 55 with Dual Regulator Do not attempt to use or maintain this unit until you read and understand these instructions Do not permit untrained persons to use or maintain this unit If you do not f...

Страница 2: ...nough oxygen for breathing will cause dizziness unconsciousness or even death These gases cannot be detected by the human senses and will be inhaled normally as if they were air Ensure there is adequa...

Страница 3: ...kPa 16 bar 1586 kPa 16 bar 1586 kPa Inner Container Bursting Disc 380 psig 380 psig 380 psig 26 bar 2620 kPa 26 bar 2620 kPa 26 bar 2620 kPa Dual Pressure Building EconomizerRegulator PressureBuilding...

Страница 4: ...When loading or unloading the container from a truck use a hand truck lift gate crane or parallel loading dock Never attempt to manually lift the unit q To move the container over rough surfaces or t...

Страница 5: ...s insulated jacket to vaporize liquid as gaseous product is withdrawn The capacity of this circuit is sufficient to vaporize liquid as gaseous product is withdrawn The capacity of this circuit is suff...

Страница 6: ...ls the gas outlet that allows product withdrawal through the internal vaporizer It has the CGA connection that matches the gas service for which the container is configured The LIQUID Valve Liquid pro...

Страница 7: ...weight Relief Devices These cylinders have a gas service relief valve and inner container bursting disc with settings of 230 psig 16 bar 1586 kPa and 380 psig 26 bar 2620 kPa respectively A22 psig 1...

Страница 8: ...ONTAINER Attach a transfer hose to the LIQUID connection and open the adjacent LIQUID valve The pressure in the container will drive liquid product out through the valve as long as the container press...

Страница 9: ...55 higher pressure at the bulk vessel The pressure differential will then push the liquid from the storage vessel to the container being filled This method is employed when no transfer pump system is...

Страница 10: ...egin the fill Start the pump at this time 2 Observe the container pressure closely If the pressure approaches the relief valve setting or the dump pressure rating stop the fill process at the supply a...

Страница 11: ...295 to 3 8 in NPT 1700 9C65 6ft 1 8m StainlessSteel LIQUID or VENT Valve CGA 295 to 3 8 in NPT 1600 9C66 6ft 1 8m StainlessSteel USE Valve CGA 580 to 3 8 in NPT GL50 8C51 Oxygen Service 6ft 1 8m Stain...

Страница 12: ...en and oxygen service for which the containers are designed Conver sion consists of changing the end connections at the USE LIQUID and VENT valves then changing the liquid level gauge scale by changin...

Страница 13: ...of the regulator to raise or lower the pressure to the desired point When decreasing the setting the pressure building valve must be closed and the container vented to a lower pressure Then repeat ste...

Страница 14: ...r and the dump valve Joints must be leak free before proceeding 2 Close the on off valve and the Dump valve 3 Slightly open the high pressure cylinder valve 4 Set the high pressure regulator above the...

Страница 15: ...ld pressure for several days but will not hold liquid NER Testing If a loss of vacuum integrity is suspected the container s Normal Evaporation Rate NER should be checked The test measures the actual...

Страница 16: ...ght tube 2 Support the gauge assembly by holding the base of the indicator tube Care must be taken to prevent interference with the spring action or from misaligning the scale sleeve Immerse teh alumi...

Страница 17: ...careful during this portion of inser tion you will drop the float rod straight though the guide ring inside the cylinder 4 To confirm that the rod is correctly positioned in the cylinder stop where y...

Страница 18: ...rque to about 20 ft lbf 2 8 kgf m Leak check the connection of gauge body to the flange CAUTION When installing the gauge assembly care must be taken to ensure that the float rod is inserted through t...

Страница 19: ...14 Body TQ Torque 80 ft lbf 11 kgf m 1 Not available as a repair part Valve Disassembly Instructions 1 Open valve by turning handwheel counterclockwise as far as it will go to release any trapped gas...

Страница 20: ...et 9 into valve body Hold body with one wrench and using another wrench 15 16 in socket tighten Bonnet to 80 ft lbf 11 kgf m torque 6 Install Bonnet Washers over Stem on Bonnet 7 Place Handwheel over...

Страница 21: ...er shock ring to the tank 3 Slide off the damaged foot ring and rubber shock ring 4 Assemble rubber shock ring into new foot ring and force over shock mount ring on container Use a rubber hammer to dr...

Страница 22: ...re source can be used to pressurize container No pressure shown 1 Bad container pressure 1 Remove and replace bad on container gauge gauge pressure gauge 2 Open inner container 2 Remove and replace bu...

Страница 23: ...valve Economizer Regulator set regulator when in use above relief valve setting Economizer side of regulator clogged or stuck open Container vents after This may be caused by Symptom should go away f...

Страница 24: ...3 8680 Theodore AL36590 0568 1 800 898 2657 in USA and Canada Accessories available for use with Taylor Wharton XL Series containers are Manifolds Automatic and Manual Container Hand Trucks Vaporizers...

Страница 25: ...Each 10 Elbow Male Brass 45 3 8 in ODT comp x 1 4 in 6814 9233 2 Each 11 Connector Lake Brass 3 8 in ODT comp x 1 4 in NPT EXT 4570 1960 2 Each 12 Tube P B Economizer Line GL45 9C20 2 Each 14 Elbow M...

Отзывы: