Hanna square table with tubular “X” base
Figure 2
Figure 3
Tools & Hardware Needed
8540-0789
Drill
Robertson # 2
#10 X 1" Oval Head
Screw (8X)
2.
Position the tubular “X” base
using the pre-drilled positioning
holes and attach it to square table
top using #10 X 1” Oval Head
Screws, (Figure 2).
3.
Drive four more screws to square
table top using #10 X 1” Oval
Head Screws, (Figure 3).
4.
Lift the table into an upright
position; level and adjust the
glides if necessary.
FEBRUARY 2020
hanna 9
Содержание Hanna Meeting Table with slim T base
Страница 1: ...Hanna installation guide February 2020 ...
Страница 23: ......
Страница 24: ...tayco com 0220 ...